IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

242

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0641 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $29,143 $35,000 Implemented
NC0641 # 02 Y:2019 02 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $18,554 $21,000 Not Implemented
NC0641 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,164 $120 Not Implemented
NC0641 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,183 $16,246 Not Implemented
NC0558 # 06 Y:2015 06 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $44 $120 Not Implemented
NC0558 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,925 $300 Implemented
NC0558 # 04 Y:2015 04 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,981 $1,000 Not Implemented
NC0558 # 01 Y:2015 01 2015 RECOVER WASTE HEAT FROM EQUIPMENT $28,923 $17,820 Not Implemented
NC0558 # 03 Y:2015 03 2015 RECOVER WASTE HEAT FROM EQUIPMENT $16,078 $5,000 Implemented
NC0558 # 07 Y:2015 07 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $63,599 $250,000 Not Implemented
NC0558 # 12 Y:2015 12 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $320 $1,595 Implemented
NC0558 # 05 Y:2015 05 2015 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,947 $6,425 Implemented
NC0558 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $296 $80 Implemented
NC0558 # 08 Y:2015 08 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,031 $227 Implemented
NC0558 # 10 Y:2015 10 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $288 $372 Implemented
NC0558 # 11 Y:2015 11 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $145 $716 Implemented
NC0554 # 08 Y:2015 08 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $147 $150 Implemented
NC0554 # 03 Y:2015 03 2015 RECOVER WASTE HEAT FROM EQUIPMENT $1,597 $4,400 Implemented
NC0554 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,085 $12,500 Implemented
NC0554 # 10 Y:2015 10 2015 DEVELOP A REPAIR/REPLACE POLICY $2,829 $4,258 Implemented
NC0554 # 04 Y:2015 04 2015 RECOVER WASTE HEAT FROM EQUIPMENT $8,465 $12,000 Implemented
NC0554 # 09 Y:2015 09 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $587 $100 Not Implemented
NC0554 # 06 Y:2015 06 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,384 $100 Implemented
NC0554 # 02 Y:2015 02 2015 INSULATE BARE EQUIPMENT $10,751 $8,568 Not Implemented
NC0554 # 05 Y:2015 05 2015 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $3,916 $4,500 Not Implemented