IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

305

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0428 # 07 Y:2011 07 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,910 $25 Implemented
NC0428 # 08 Y:2011 08 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $681 $100 Implemented
MZ0065 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,183 $3,000 Implemented
MZ0065 # 02 Y:2011 02 2011 INSTALL OCCUPANCY SENSORS $2,106 $2,120 Implemented
MZ0065 # 03 Y:2011 03 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $23,154 $100,000 Not Implemented
MZ0065 # 04 Y:2011 04 2011 USE SOLAR HEAT TO HEAT WATER $300 $2,500 Implemented
MZ0065 # 05 Y:2011 05 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,566 $20,000 Not Implemented
MZ0065 # 06 Y:2011 06 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,073 $1,500 Implemented
MZ0065 # 07 Y:2011 07 2011 INSULATE BARE EQUIPMENT $1,078 $963 Not Implemented
MZ0065 # 08 Y:2011 08 2011 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,240 $0 Not Implemented
DL0071 # 01 Y:2011 01 2011 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $1,220 $600 Implemented
DL0071 # 02 Y:2011 02 2011 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $650 $0 Implemented
DL0071 # 03 Y:2011 03 2011 REDUCE VENTILATION AIR $4,520 $0 Implemented
DL0071 # 04 Y:2011 04 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,600 $5,300 Not Implemented
DL0071 # 05 Y:2011 05 2011 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,970 $2,390 Not Implemented
DL0071 # 06 Y:2011 06 2011 INSULATE BARE EQUIPMENT $430 $180 Not Implemented
DL0071 # 07 Y:2011 07 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $710 $100 Implemented
DL0071 # 08 Y:2011 08 2011 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $590 $2,484 Implemented
DL0071 # 09 Y:2011 09 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,676 $1,800 Not Implemented
DL0071 # 10 Y:2011 10 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,668 $2,500 Implemented
DL0071 # 11 Y:2011 11 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,960 $4,000 Implemented
LL0351 # 01 Y:2011 01 2011 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $2,759 $180 Implemented
LL0351 # 02 Y:2011 02 2011 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,768 $60 Implemented
LL0351 # 03 Y:2011 03 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,130 $60 Implemented
LL0351 # 04 Y:2011 04 2011 USE PHOTOCELL CONTROLS $740 $90 Implemented