Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

287

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0586 # 07 Y:2019 07 2019 INSTALL TIMERS AND/OR THERMOSTATS $1,750 $350 Implemented
SD0586 # 06 Y:2019 06 2019 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $1,834 $2,795 Implemented
SD0586 # 05 Y:2019 05 2019 INSTALL OCCUPANCY SENSORS $1,882 $330 Implemented
SD0586 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,460 $0 Implemented
SD0586 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,548 $17,875 Implemented
SD0586 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,164 $24,783 Implemented
SD0586 # 01 Y:2019 01 2019 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $57,437 $117,800 Implemented
MZ0280 # 05 Y:2019 05 2019 INSTALL OCCUPANCY SENSORS $14,313 $9,858 Not Implemented
MZ0280 # 06 Y:2019 06 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,016 $3,196 Not Implemented
MZ0280 # 07 Y:2019 07 2019 PAY UTILITY BILLS ON TIME $5,205 $0 Not Implemented
MZ0280 # 08 Y:2019 08 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,754 $3,520 Not Implemented
MZ0280 # 09 Y:2019 09 2019 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $4,436 $8,160 Not Implemented
MZ0280 # 10 Y:2019 10 2019 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $3,747 $6,080 Not Implemented
MZ0280 # 11 Y:2019 11 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,072 $1,664 Not Implemented
MZ0280 # 12 Y:2019 12 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,153 $550 Not Implemented
MZ0280 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,792 $2,148 Not Implemented
MZ0280 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,503 $24,934 Not Implemented
MZ0280 # 02 Y:2019 02 2019 USE OPTIMUM THICKNESS INSULATION $23,499 $2,058 Not Implemented
MZ0280 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $24,867 $24,520 Not Implemented
MA0805 # 07 Y:2019 07 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,131 $5,222 Not Implemented
MA0805 # 01 Y:2019 01 2019 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $96,513 $144,000 Not Implemented
MA0805 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $82,405 $128,486 Implemented
MA0805 # 03 Y:2019 03 2019 USE SOLAR HEAT FOR HEAT $77,280 $383,955 Not Implemented
MA0805 # 04 Y:2019 04 2019 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $40,486 $165,914 Not Implemented
MA0805 # 06 Y:2019 06 2019 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $25,552 $7,916 Not Implemented