Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
49
matching recommendationsSIC | 302 | Rubber And Plastics Footwear |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0189 # 01 Y:2001 | 01 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,697 | $10,450 | Not Implemented |
BD0189 # 02 Y:2001 | 02 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,676 | $1,875 | Not Implemented |
BD0189 # 03 Y:2001 | 03 | 2001 | INSTALL OCCUPANCY SENSORS | $1,612 | $1,000 | Not Implemented |
BD0189 # 04 Y:2001 | 04 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,134 | $0 | Not Implemented |
BD0189 # 05 Y:2001 | 05 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $501 | $1,300 | Not Implemented |
BD0189 # 06 Y:2001 | 06 | 2001 | INSTALL / REPAIR INSULATION ON STEAM LINES | $397 | $1,050 | Not Implemented |
BD0189 # 07 Y:2001 | 07 | 2001 | MINIMIZE WATER USAGE | $1,633 | $100 | Implemented |
BD0189 # 08 Y:2001 | 08 | 2001 | MINIMIZE WATER USAGE | $429 | $1,550 | Implemented |
BD0189 # 09 Y:2001 | 09 | 2001 | AUTOMATE PAYROLL SYSTEM | $19,000 | $18,000 | Not Implemented |
BD0189 # 10 Y:2001 | 10 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $15,750 | $2,000 | Implemented |
BD0189 # 11 Y:2001 | 11 | 2001 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $1,680 | $300 | Not Implemented |
KU0486 # 09 Y:1997 | 09 | 1997 | COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES | $590 | $170 | Not Implemented |
KU0486 # 01 Y:1997 | 01 | 1997 | INSULATE BARE EQUIPMENT | $12,940 | $11,560 | Implemented |
KU0486 # 02 Y:1997 | 02 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,710 | $13,580 | Implemented |
KU0486 # 03 Y:1997 | 03 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,010 | $790 | Implemented |
KU0486 # 04 Y:1997 | 04 | 1997 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,080 | $9,220 | Not Implemented |
KU0486 # 05 Y:1997 | 05 | 1997 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,990 | $10,200 | Implemented |
KU0486 # 06 Y:1997 | 06 | 1997 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,020 | $2,980 | Implemented |
KU0486 # 07 Y:1997 | 07 | 1997 | INSTALL OCCUPANCY SENSORS | $1,560 | $1,150 | Implemented |
KU0486 # 08 Y:1997 | 08 | 1997 | RECYCLE WASTE INK AND CLEANUP SOLVENT | $3,180 | $0 | Not Implemented |
UD0475 # 07 Y:1995 | 07 | 1995 | CONVERT FROM BATCH TO CONTINUOUS OPERATION | $168,025 | $200,000 | Not Implemented |
UD0475 # 06 Y:1995 | 06 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,260 | $16,682 | Not Implemented |
UD0475 # 05 Y:1995 | 05 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,440 | $10,410 | Not Implemented |
UD0475 # 04 Y:1995 | 04 | 1995 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,114 | $8,000 | Not Implemented |
UD0475 # 03 Y:1995 | 03 | 1995 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $8,535 | $4,300 | Not Implemented |