IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

49

matching recommendations
Reset
SIC 302 Rubber And Plastics Footwear
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0189 # 01 Y:2001 01 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,697 $10,450 Not Implemented
BD0189 # 02 Y:2001 02 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,676 $1,875 Not Implemented
BD0189 # 03 Y:2001 03 2001 INSTALL OCCUPANCY SENSORS $1,612 $1,000 Not Implemented
BD0189 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,134 $0 Not Implemented
BD0189 # 05 Y:2001 05 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $501 $1,300 Not Implemented
BD0189 # 06 Y:2001 06 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $397 $1,050 Not Implemented
BD0189 # 07 Y:2001 07 2001 MINIMIZE WATER USAGE $1,633 $100 Implemented
BD0189 # 08 Y:2001 08 2001 MINIMIZE WATER USAGE $429 $1,550 Implemented
BD0189 # 09 Y:2001 09 2001 AUTOMATE PAYROLL SYSTEM $19,000 $18,000 Not Implemented
BD0189 # 10 Y:2001 10 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $15,750 $2,000 Implemented
BD0189 # 11 Y:2001 11 2001 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,680 $300 Not Implemented
KU0486 # 09 Y:1997 09 1997 COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES $590 $170 Not Implemented
KU0486 # 01 Y:1997 01 1997 INSULATE BARE EQUIPMENT $12,940 $11,560 Implemented
KU0486 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,710 $13,580 Implemented
KU0486 # 03 Y:1997 03 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,010 $790 Implemented
KU0486 # 04 Y:1997 04 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,080 $9,220 Not Implemented
KU0486 # 05 Y:1997 05 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,990 $10,200 Implemented
KU0486 # 06 Y:1997 06 1997 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,020 $2,980 Implemented
KU0486 # 07 Y:1997 07 1997 INSTALL OCCUPANCY SENSORS $1,560 $1,150 Implemented
KU0486 # 08 Y:1997 08 1997 RECYCLE WASTE INK AND CLEANUP SOLVENT $3,180 $0 Not Implemented
UD0475 # 07 Y:1995 07 1995 CONVERT FROM BATCH TO CONTINUOUS OPERATION $168,025 $200,000 Not Implemented
UD0475 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,260 $16,682 Not Implemented
UD0475 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,440 $10,410 Not Implemented
UD0475 # 04 Y:1995 04 1995 RECOVER WASTE HEAT FROM EQUIPMENT $8,114 $8,000 Not Implemented
UD0475 # 03 Y:1995 03 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $8,535 $4,300 Not Implemented