IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,181

matching recommendations
Reset
SIC 305 Hose & Belting & Gaskets & Packing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0581 # 07 Y:2005 07 2005 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $10,812 $5,328 Implemented
MA0581 # 08 Y:2005 08 2005 RECOVER WASTE HEAT FROM EQUIPMENT $10,675 $4,675 Implemented
MA0581 # 09 Y:2005 09 2005 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $9,508 $160 Implemented
MA0581 # 10 Y:2005 10 2005 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $5,166 $3,100 Implemented
MA0581 # 11 Y:2005 11 2005 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $3,467 $8,300 Implemented
MA0581 # 12 Y:2005 12 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,134 $6,429 Not Implemented
NC0313 # 01 Y:2005 01 2005 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $9,148 $15,000 Not Implemented
NC0313 # 02 Y:2005 02 2005 UTILIZE A LESS EXPENSIVE COOLING METHOD $17,625 $50,000 Not Implemented
NC0313 # 03 Y:2005 03 2005 ADJUST BURNERS FOR EFFICIENT OPERATION $10,261 $2,000 Implemented
NC0313 # 04 Y:2005 04 2005 USE MINIMUM STEAM OPERATING PRESSURE $7,578 $200 Not Implemented
NC0313 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $274 $100 Implemented
NC0305 # 01 Y:2004 01 2004 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $36,051 $3,500 Not Implemented
NC0305 # 02 Y:2004 02 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,108 $200 Not Implemented
NC0305 # 03 Y:2004 03 2004 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,452 $2,000 Not Implemented
NC0305 # 04 Y:2004 04 2004 RECOVER WASTE HEAT FROM EQUIPMENT $2,897 $2,750 Not Implemented
NC0305 # 05 Y:2004 05 2004 ADJUST BURNERS FOR EFFICIENT OPERATION $2,802 $1,000 Not Implemented
NC0305 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $349 $100 Implemented
NC0305 # 07 Y:2004 07 2004 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $320 $58 Implemented
BD0268 # 01 Y:2004 01 2004 AIR CONDITION ONLY SPACE NECESSARY $352,557 $1,500,000 Implemented
BD0268 # 02 Y:2004 02 2004 SUBSTITUTE HOT PROCESS FLUIDS FOR STEAM $81,415 $130,000 Implemented
BD0268 # 03 Y:2004 03 2004 ADJUST BURNERS FOR EFFICIENT OPERATION $40,434 $49,000 Implemented
BD0268 # 04 Y:2004 04 2004 HEAT WATER WITH EXHAUST HEAT $31,790 $35,000 Implemented
BD0268 # 05 Y:2004 05 2004 ADD AREA LIGHTING SWITCHES $14,266 $9,000 Not Implemented
BD0268 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,170 $200 Implemented
BD0268 # 07 Y:2004 07 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,701 $1,500 Implemented