IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,181

matching recommendations
Reset
SIC 305 Hose & Belting & Gaskets & Packing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0043 # 02 Y:1994 02 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,021 $6,120 Not Implemented
WV0043 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $787 $500 Implemented
WV0043 # 04 Y:1994 04 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $399 $372 Not Implemented
WV0043 # 05 Y:1994 05 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,644 $100 Implemented
WV0043 # 06 Y:1994 06 1994 RECOVER WASTE HEAT FROM EQUIPMENT $1,788 $530 Not Implemented
WV0043 # 07 Y:1994 07 1994 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $9,680 $6,985 Not Implemented
NC0029 # 01 Y:1994 01 1994 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $11,457 $153,000 Not Implemented
NC0029 # 02 Y:1994 02 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,131 $480 Implemented
NC0029 # 03 Y:1994 03 1994 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $14,345 $40,000 Implemented
NC0029 # 04 Y:1994 04 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,050 $520 Not Implemented
NC0029 # 05 Y:1994 05 1994 INSULATE BARE EQUIPMENT $562 $378 Not Implemented
OD0004 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,341 $800 Implemented
OD0004 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,431 $11,417 Implemented
OD0004 # 03 Y:1994 03 1994 INSTALL TIMERS AND/OR THERMOSTATS $2,461 $780 Not Implemented
OD0004 # 04 Y:1994 04 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $424 $548 Not Implemented
GT0525 # 01 Y:1994 01 1994 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $6,630 $5,000 Not Implemented
GT0525 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,470 $6,520 Implemented
GT0525 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,860 $1,150 Implemented
GT0525 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,170 $32,530 Implemented
GT0525 # 05 Y:1994 05 1994 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $7,600 $2,550 Not Implemented
GT0525 # 06 Y:1994 06 1994 COVER OPEN TANKS $2,280 $740 Not Implemented
MA0302 # 01 Y:1994 01 1994 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $19,139 $8,246 Not Implemented
MA0302 # 02 Y:1994 02 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,102 $180 Implemented
MA0302 # 03 Y:1994 03 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $8,142 $25,365 Not Implemented
MA0302 # 04 Y:1994 04 1994 BURN A LESS EXPENSIVE GRADE OF FUEL $9,629 $17,304 Implemented