IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

73

matching recommendations
Reset
SIC 305 Hose & Belting & Gaskets & Packing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0546 # 11 Y:2017 11 2017 INSULATE BARE EQUIPMENT $239 $342 Implemented
WV0546 # 05 Y:2017 05 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,190 $854 Not Implemented
WV0546 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,920 $4,595 Implemented
WV0546 # 03 Y:2017 03 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,180 $11,575 Implemented
WV0546 # 02 Y:2017 02 2017 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $7,220 $1,000 Not Implemented
WV0546 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,125 $26,267 Implemented
WV0546 # 12 Y:2017 12 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $216 $50 Not Implemented
WV0546 # 08 Y:2017 08 2017 DEVELOP A REPAIR/REPLACE POLICY $1,672 $600 Implemented
WV0546 # 09 Y:2017 09 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,670 $1,100 Implemented
WV0546 # 07 Y:2017 07 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,898 $0 Implemented
WV0546 # 10 Y:2017 10 2017 MINIMIZE WATER USAGE $393 $1,750 Not Implemented
WV0546 # 06 Y:2017 06 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,152 $6,100 Implemented
WV0485 # 03 Y:2014 03 2014 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $5,371 $10,550 Not Implemented
WV0485 # 12 Y:2014 12 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $691 $426 Implemented
WV0485 # 02 Y:2014 02 2014 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $9,166 $12,500 Not Implemented
WV0485 # 07 Y:2014 07 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,038 $175 Implemented
WV0485 # 08 Y:2014 08 2014 INSTALL OCCUPANCY SENSORS $2,805 $3,000 Implemented
WV0485 # 09 Y:2014 09 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,922 $1,719 Not Implemented
WV0485 # 05 Y:2014 05 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,703 $500 Implemented
WV0485 # 01 Y:2014 01 2014 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $11,434 $1,000 Not Implemented
WV0485 # 10 Y:2014 10 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,635 $4,433 Not Implemented
WV0485 # 11 Y:2014 11 2014 DEVELOP A REPAIR/REPLACE POLICY $1,516 $696 Implemented
WV0485 # 06 Y:2014 06 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,806 $4,815 Not Implemented
WV0485 # 04 Y:2014 04 2014 INSULATE BARE EQUIPMENT $5,211 $2,981 Implemented
WV0325 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,009 $0 Implemented