IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

81

matching recommendations
Reset
SIC 305 Hose & Belting & Gaskets & Packing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0427 # 02 Y:1998 02 1998 OPTIMIZE PLANT POWER FACTOR $5,715 $7,055 Implemented
MA0427 # 04 Y:1998 04 1998 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $4,093 $4,800 Not Implemented
MA0427 # 03 Y:1998 03 1998 RECOVER WASTE HEAT FROM EQUIPMENT $2,885 $242 Not Implemented
MA0427 # 01 Y:1998 01 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,186 $19,050 Implemented
MA0427 # 06 Y:1998 06 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,828 $426 Implemented
MA0427 # 05 Y:1998 05 1998 CONTRACT A WOOD PALLET RECYCLING COMPANY $3,533 $2,700 Not Implemented
MA0427 # 08 Y:1998 08 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $836 $200 Implemented
MA0427 # 07 Y:1998 07 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,159 $1,840 Not Implemented
KU0507 # 06 Y:1998 06 1998 INSTALL OCCUPANCY SENSORS $320 $200 Not Implemented
KU0507 # 05 Y:1998 05 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $520 $890 Implemented
KU0507 # 04 Y:1998 04 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $540 $430 Not Implemented
KU0507 # 03 Y:1998 03 1998 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $870 $7,500 Not Implemented
KU0507 # 02 Y:1998 02 1998 INSULATE BARE EQUIPMENT $900 $1,190 Implemented
KU0507 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,100 $9,690 Implemented
KU0507 # 07 Y:1998 07 1998 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $22,350 $790 Implemented
MA0426 # 03 Y:1998 03 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $623 $25 Implemented
MA0426 # 05 Y:1998 05 1998 INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS $2,320 $9,100 Not Implemented
MA0426 # 04 Y:1998 04 1998 USE RADIANT HEATER FOR SPOT HEATING $902 $1,975 Not Implemented
MA0426 # 01 Y:1998 01 1998 OPTIMIZE PLANT POWER FACTOR $9,368 $24,200 Not Implemented
MA0426 # 02 Y:1998 02 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $586 $458 Implemented
GT0648 # 06 Y:1998 06 1998 REUSE / RECYCLE/ SELL RUBBER PRODUCTS $45 $0 Not Implemented
GT0648 # 05 Y:1998 05 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $2,000 $1,000 Implemented
GT0648 # 04 Y:1998 04 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $7,500 $0 Implemented
GT0648 # 03 Y:1998 03 1998 INSTALL OCCUPANCY SENSORS $97 $52 Not Implemented
GT0648 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $153 $168 Not Implemented