IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

42

matching recommendations
Reset
SIC 305 Hose & Belting & Gaskets & Packing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0517 # 02 Y:2002 02 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $11,697 $33,800 Not Implemented
MA0517 # 03 Y:2002 03 2002 USE MINIMUM SAFE OVEN VENTILATION $7,427 $2,100 Implemented
MA0517 # 04 Y:2002 04 2002 PAY BILLS ON TIME TO AVOID LATE FEES $6,528 $0 Implemented
MA0517 # 05 Y:2002 05 2002 INSULATE BARE EQUIPMENT $6,349 $9,636 Implemented
MA0517 # 06 Y:2002 06 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,140 $5,200 Implemented
MA0517 # 07 Y:2002 07 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,164 $2,500 Implemented
MA0517 # 08 Y:2002 08 2002 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $853 $1,515 Implemented
MA0517 # 01 Y:2002 01 2002 COVER OPEN TANKS $30,107 $4,262 Implemented
UM0220 # 01 Y:2002 01 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,258 $25,000 Not Implemented
UM0220 # 06 Y:2002 06 2002 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $1,928 $2,400 Not Implemented
UM0220 # 07 Y:2002 07 2002 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,690 $10,000 Not Implemented
UM0220 # 02 Y:2002 02 2002 MAINTAIN MACHINES TO REDUCE LEAKS $7,380 $1,150 Implemented
UM0220 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $973 $1,700 Implemented
UM0220 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,947 $2,064 Not Implemented
UM0220 # 05 Y:2002 05 2002 AIR CONDITION ONLY SPACE NECESSARY $4,385 $800 Not Implemented
AM0418 # 08 Y:2002 08 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,400 $140 Implemented
AM0418 # 09 Y:2002 09 2002 INSULATE BARE EQUIPMENT $1,300 $310 Not Implemented
AM0418 # 10 Y:2002 10 2002 PAY UTILITY BILLS ON TIME $1,008 $0 Implemented
AM0418 # 07 Y:2002 07 2002 INSULATE BARE EQUIPMENT $1,600 $480 Not Implemented
AM0418 # 06 Y:2002 06 2002 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $1,650 $1,080 Implemented
AM0418 # 05 Y:2002 05 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,400 $930 Not Implemented
AM0418 # 04 Y:2002 04 2002 COVER OPEN TANKS $3,000 $0 Not Implemented
AM0418 # 03 Y:2002 03 2002 REPAIR AND ELIMINATE STEAM LEAKS $9,500 $200 Implemented
AM0418 # 02 Y:2002 02 2002 INSTALL EQUIPMENT TO MOVE PRODUCT $20,000 $6,000 Implemented
AM0418 # 01 Y:2002 01 2002 REPAIR OR REPLACE STEAM TRAPS $33,700 $4,735 Implemented