IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

459

matching recommendations
Reset
SIC 3052 Rubber & Plastics Hose & Belting
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0330 # 07 Y:2025 07 2025 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $6,469 $25,000 n/a
TT0330 # 05 Y:2025 05 2025 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $11,614 $38,380 n/a
TT0330 # 10 Y:2025 10 2025 INCREASE AMOUNT OF CONDENSATE RETURNED $928 $5,000 n/a
TT0330 # 12 Y:2025 12 2025 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $529 $1,344 n/a
TT0330 # 11 Y:2025 11 2025 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $642 $1,400 n/a
TT0330 # 03 Y:2025 03 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $25,346 $1,500 n/a
TT0330 # 02 Y:2025 02 2025 INSTALL OCCUPANCY SENSORS $30,472 $17,136 n/a
TT0330 # 08 Y:2025 08 2025 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,319 $3,400 n/a
TT0330 # 06 Y:2025 06 2025 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $10,702 $50,000 n/a
TT0330 # 04 Y:2025 04 2025 TURN OFF EQUIPMENT WHEN NOT IN USE $19,725 $12,000 n/a
TT0330 # 09 Y:2025 09 2025 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $2,928 $11,800 n/a
TT0330 # 01 Y:2025 01 2025 USE SOLAR HEAT TO MAKE ELECTRICTY $508,143 $2,436,747 n/a
NT0027 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,456 $5,609 Implemented
NT0027 # 04 Y:2024 04 2024 OPTIMIZE PLANT POWER FACTOR $2,533 $1,946 Not Implemented
NT0027 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,267 $5,347 Not Implemented
NT0027 # 05 Y:2024 05 2024 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $4,408 $3,040 Not Implemented
NT0027 # 03 Y:2024 03 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,335 $0 Implemented
OK1077 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,255 $7,590 Not Implemented
OK1077 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,559 $9,108 Not Implemented
OK1077 # 04 Y:2022 04 2022 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,586 $7,371 Not Implemented
OK1077 # 02 Y:2022 02 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $24,215 $230,880 Not Implemented
OK1077 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $530 $347 Implemented
GT0950 # 05 Y:2020 05 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $337 $401 Implemented
GT0950 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43,586 $47,656 Implemented
GT0950 # 06 Y:2020 06 2020 OPTIMIZE PLANT POWER FACTOR $1,358 $5,106 Not Implemented