IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
SIC 3052 Rubber & Plastics Hose & Belting
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0546 # 11 Y:2017 11 2017 INSULATE BARE EQUIPMENT $239 $342 Implemented
WV0546 # 05 Y:2017 05 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,190 $854 Not Implemented
WV0546 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,920 $4,595 Implemented
WV0546 # 03 Y:2017 03 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,180 $11,575 Implemented
WV0546 # 02 Y:2017 02 2017 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $7,220 $1,000 Not Implemented
WV0546 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,125 $26,267 Implemented
WV0546 # 12 Y:2017 12 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $216 $50 Not Implemented
WV0546 # 08 Y:2017 08 2017 DEVELOP A REPAIR/REPLACE POLICY $1,672 $600 Implemented
WV0546 # 09 Y:2017 09 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,670 $1,100 Implemented
WV0546 # 07 Y:2017 07 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,898 $0 Implemented
WV0546 # 10 Y:2017 10 2017 MINIMIZE WATER USAGE $393 $1,750 Not Implemented
WV0546 # 06 Y:2017 06 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,152 $6,100 Implemented
UD0619 # 04 Y:2001 04 2001 RECOVER AND REUSE WASTE MATERIAL $5,700 $0 Not Implemented
UD0619 # 08 Y:2001 08 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $940 $2,256 Not Implemented
UD0619 # 07 Y:2001 07 2001 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,873 $2,400 Implemented
UD0619 # 06 Y:2001 06 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,846 $5,628 Implemented
UD0619 # 05 Y:2001 05 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $6,322 $940 Implemented
UD0619 # 03 Y:2001 03 2001 METER WASTE WATER $14,438 $500 Implemented
UD0619 # 02 Y:2001 02 2001 REPROCESS SPENT OILS ON SITE FOR RE-USE $18,573 $6,262 Implemented
UD0619 # 01 Y:2001 01 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $124,956 $0 Implemented
UD0566 # 01 Y:1999 01 1999 REUSE / RECYCLE/ SELL RUBBER PRODUCTS $110,878 $86,000 Not Implemented
UD0566 # 07 Y:1999 07 1999 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,524 $0 Not Implemented
UD0566 # 06 Y:1999 06 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $10,800 $0 Not Implemented
UD0566 # 05 Y:1999 05 1999 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,598 $15,000 Implemented
UD0566 # 04 Y:1999 04 1999 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $19,000 $0 Not Implemented