IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
Reset
SIC 3052 Rubber & Plastics Hose & Belting
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0330 # 12 Y:2025 12 2025 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $529 $1,344 n/a
TT0330 # 01 Y:2025 01 2025 USE SOLAR HEAT TO MAKE ELECTRICTY $508,143 $2,436,747 n/a
TT0330 # 02 Y:2025 02 2025 INSTALL OCCUPANCY SENSORS $30,472 $17,136 n/a
TT0330 # 03 Y:2025 03 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $25,346 $1,500 n/a
TT0330 # 04 Y:2025 04 2025 TURN OFF EQUIPMENT WHEN NOT IN USE $19,725 $12,000 n/a
TT0330 # 05 Y:2025 05 2025 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $11,614 $38,380 n/a
TT0330 # 06 Y:2025 06 2025 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $10,702 $50,000 n/a
TT0330 # 07 Y:2025 07 2025 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $6,469 $25,000 n/a
TT0330 # 08 Y:2025 08 2025 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,319 $3,400 n/a
TT0330 # 09 Y:2025 09 2025 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $2,928 $11,800 n/a
TT0330 # 10 Y:2025 10 2025 INCREASE AMOUNT OF CONDENSATE RETURNED $928 $5,000 n/a
TT0330 # 11 Y:2025 11 2025 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $642 $1,400 n/a
TT0235 # 02 Y:2020 02 2020 APPLY FOR INVESTMENT INCENTIVES $51,142 $11,500 Not Implemented
TT0235 # 06 Y:2020 06 2020 INSULATE BARE EQUIPMENT $3,534 $9,920 Not Implemented
TT0235 # 05 Y:2020 05 2020 APPLY FOR INVESTMENT INCENTIVES $4,581 $120 Not Implemented
TT0235 # 04 Y:2020 04 2020 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,885 $12,000 Not Implemented
TT0235 # 03 Y:2020 03 2020 OPTIMIZE PLANT POWER FACTOR $24,204 $32,000 Not Implemented
TT0235 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $64,019 $180,485 Not Implemented
TT0115 # 03 Y:2013 03 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $21,000 $50,000 Not Implemented
TT0115 # 01 Y:2013 01 2013 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $18,000 $50,000 Implemented
TT0115 # 02 Y:2013 02 2013 FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM $18,000 $50,000 Implemented
TT0115 # 04 Y:2013 04 2013 OPTIMIZE PLANT POWER FACTOR $32,990 $129,250 Not Implemented
TT0115 # 05 Y:2013 05 2013 REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT $146,360 $450,000 Not Implemented
TT0115 # 06 Y:2013 06 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,000 $4,000 Not Implemented
TT0115 # 07 Y:2013 07 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,635 $2,500 Not Implemented