IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

718

matching recommendations
Reset
SIC 3053 Gaskets, Packing And Sealing Devices
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0426 # 02 Y:1998 02 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $586 $458 Implemented
MA0426 # 03 Y:1998 03 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $623 $25 Implemented
MA0426 # 04 Y:1998 04 1998 USE RADIANT HEATER FOR SPOT HEATING $902 $1,975 Not Implemented
MA0426 # 05 Y:1998 05 1998 INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS $2,320 $9,100 Not Implemented
UL0201 # 01 Y:1998 01 1998 OPTIMIZE PLANT POWER FACTOR $958 $3,132 Implemented
UL0201 # 02 Y:1998 02 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,962 $1,518 Not Implemented
UL0201 # 03 Y:1998 03 1998 USE EVAPORATION TO CONCENTRATE MATERIAL $2,084 $5,160 Not Implemented
UL0201 # 04 Y:1998 04 1998 MINIMIZE USE OF RAGS THROUGH WORKER TRAINING $4,045 $1,125 Not Implemented
UL0201 # 05 Y:1998 05 1998 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $672,266 $138,250 Not Implemented
UL0201 # 06 Y:1998 06 1998 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $342,000 $12,150 Implemented
WI0331 # 01 Y:1998 01 1998 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $45,000 $0 Implemented
WI0331 # 02 Y:1998 02 1998 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $6,295 $11,500 Not Implemented
WI0331 # 03 Y:1998 03 1998 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $6,880 $500 Implemented
WI0331 # 04 Y:1998 04 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,975 $8,500 Not Implemented
WI0331 # 05 Y:1998 05 1998 REPLACE CLOTH RAGS WITH PAPER TOWELS $1,218 $0 Not Implemented
WI0331 # 06 Y:1998 06 1998 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $3,729 $0 Not Implemented
WI0331 # 07 Y:1998 07 1998 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,249 $300 Implemented
WI0331 # 08 Y:1998 08 1998 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $897 $608 Not Implemented
MA0415 # 01 Y:1998 01 1998 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $47,834 $5,100 Not Implemented
MA0415 # 02 Y:1998 02 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $53,137 $200,000 Not Implemented
MA0415 # 03 Y:1998 03 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $62,915 $200,000 Not Implemented
MA0415 # 04 Y:1998 04 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,174 $10,000 Not Implemented
MA0415 # 05 Y:1998 05 1998 RECOVER WASTE HEAT FROM EQUIPMENT $1,748 $2,019 Implemented
MA0415 # 06 Y:1998 06 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,750 $17,906 Implemented
MA0415 # 07 Y:1998 07 1998 OPTIMIZE PLANT POWER FACTOR $1,487 $5,700 Not Implemented