Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
718
matching recommendationsSIC | 3053 | Gaskets, Packing And Sealing Devices |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0426 # 02 Y:1998 | 02 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $586 | $458 | Implemented |
MA0426 # 03 Y:1998 | 03 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $623 | $25 | Implemented |
MA0426 # 04 Y:1998 | 04 | 1998 | USE RADIANT HEATER FOR SPOT HEATING | $902 | $1,975 | Not Implemented |
MA0426 # 05 Y:1998 | 05 | 1998 | INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS | $2,320 | $9,100 | Not Implemented |
UL0201 # 01 Y:1998 | 01 | 1998 | OPTIMIZE PLANT POWER FACTOR | $958 | $3,132 | Implemented |
UL0201 # 02 Y:1998 | 02 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,962 | $1,518 | Not Implemented |
UL0201 # 03 Y:1998 | 03 | 1998 | USE EVAPORATION TO CONCENTRATE MATERIAL | $2,084 | $5,160 | Not Implemented |
UL0201 # 04 Y:1998 | 04 | 1998 | MINIMIZE USE OF RAGS THROUGH WORKER TRAINING | $4,045 | $1,125 | Not Implemented |
UL0201 # 05 Y:1998 | 05 | 1998 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $672,266 | $138,250 | Not Implemented |
UL0201 # 06 Y:1998 | 06 | 1998 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $342,000 | $12,150 | Implemented |
WI0331 # 01 Y:1998 | 01 | 1998 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $45,000 | $0 | Implemented |
WI0331 # 02 Y:1998 | 02 | 1998 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $6,295 | $11,500 | Not Implemented |
WI0331 # 03 Y:1998 | 03 | 1998 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $6,880 | $500 | Implemented |
WI0331 # 04 Y:1998 | 04 | 1998 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $3,975 | $8,500 | Not Implemented |
WI0331 # 05 Y:1998 | 05 | 1998 | REPLACE CLOTH RAGS WITH PAPER TOWELS | $1,218 | $0 | Not Implemented |
WI0331 # 06 Y:1998 | 06 | 1998 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $3,729 | $0 | Not Implemented |
WI0331 # 07 Y:1998 | 07 | 1998 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,249 | $300 | Implemented |
WI0331 # 08 Y:1998 | 08 | 1998 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $897 | $608 | Not Implemented |
MA0415 # 01 Y:1998 | 01 | 1998 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $47,834 | $5,100 | Not Implemented |
MA0415 # 02 Y:1998 | 02 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $53,137 | $200,000 | Not Implemented |
MA0415 # 03 Y:1998 | 03 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $62,915 | $200,000 | Not Implemented |
MA0415 # 04 Y:1998 | 04 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $3,174 | $10,000 | Not Implemented |
MA0415 # 05 Y:1998 | 05 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,748 | $2,019 | Implemented |
MA0415 # 06 Y:1998 | 06 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,750 | $17,906 | Implemented |
MA0415 # 07 Y:1998 | 07 | 1998 | OPTIMIZE PLANT POWER FACTOR | $1,487 | $5,700 | Not Implemented |