Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
58
matching recommendationsSIC | 3053 | Gaskets, Packing And Sealing Devices |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MAS027 # 01 Y:2012 | 01 | 2012 | REDUCE VENTILATION AIR | $23,907 | $33,500 | Not Implemented |
MAS027 # 02 Y:2012 | 02 | 2012 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $11,449 | $28,000 | Not Implemented |
MAS027 # 03 Y:2012 | 03 | 2012 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $2,336 | $500 | Not Implemented |
IA0479 # 02 Y:2012 | 02 | 2012 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,268 | $549 | Implemented |
IA0479 # 03 Y:2012 | 03 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $447 | $752 | Not Implemented |
IA0479 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,057 | $158 | Implemented |
IA0479 # 05 Y:2012 | 05 | 2012 | REPOSITION OVEN WALLS TO REDUCE HEATED SPACE | $400 | $1,030 | Not Implemented |
IA0479 # 06 Y:2012 | 06 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $655 | $3,430 | Not Implemented |
IA0479 # 07 Y:2012 | 07 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,014 | $250 | Not Implemented |
IA0479 # 08 Y:2012 | 08 | 2012 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $234 | $240 | Not Implemented |
IA0479 # 01 Y:2012 | 01 | 2012 | INSTALL OCCUPANCY SENSORS | $2,675 | $2,732 | Implemented |
IP0001 # 07 Y:2012 | 07 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,320 | $17,272 | Not Implemented |
IP0001 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,200 | $8,348 | Implemented |
IP0001 # 03 Y:2012 | 03 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $93 | $0 | Implemented |
IP0001 # 02 Y:2012 | 02 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,247 | $0 | Implemented |
IP0001 # 01 Y:2012 | 01 | 2012 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $75,906 | $0 | Not Implemented |
IP0001 # 05 Y:2012 | 05 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,454 | $1,300 | Not Implemented |
IP0001 # 06 Y:2012 | 06 | 2012 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $16,942 | $80,000 | Implemented |
SD0447 # 01 Y:2012 | 01 | 2012 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $1,132 | $320 | Not Implemented |
SD0447 # 04 Y:2012 | 04 | 2012 | INSTALL OCCUPANCY SENSORS | $472 | $640 | Not Implemented |
SD0447 # 06 Y:2012 | 06 | 2012 | INSTALL SKYLIGHTS | $4,128 | $7,660 | Not Implemented |
SD0447 # 05 Y:2012 | 05 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,491 | $12,231 | Not Implemented |
SD0447 # 03 Y:2012 | 03 | 2012 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $34,656 | $38,885 | Not Implemented |
SD0447 # 02 Y:2012 | 02 | 2012 | INSTALL SKYLIGHTS | $14,679 | $13,457 | Not Implemented |
MAS021 # 05 Y:2012 | 05 | 2012 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $4,883 | $3,120 | Implemented |