Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

58

matching recommendations
Reset
SIC 3053 Gaskets, Packing And Sealing Devices
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MAS027 # 01 Y:2012 01 2012 REDUCE VENTILATION AIR $23,907 $33,500 Not Implemented
MAS027 # 02 Y:2012 02 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $11,449 $28,000 Not Implemented
MAS027 # 03 Y:2012 03 2012 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $2,336 $500 Not Implemented
IA0479 # 02 Y:2012 02 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,268 $549 Implemented
IA0479 # 03 Y:2012 03 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $447 $752 Not Implemented
IA0479 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,057 $158 Implemented
IA0479 # 05 Y:2012 05 2012 REPOSITION OVEN WALLS TO REDUCE HEATED SPACE $400 $1,030 Not Implemented
IA0479 # 06 Y:2012 06 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $655 $3,430 Not Implemented
IA0479 # 07 Y:2012 07 2012 RECOVER WASTE HEAT FROM EQUIPMENT $1,014 $250 Not Implemented
IA0479 # 08 Y:2012 08 2012 DIRECT WARMEST AIR TO COMBUSTION INTAKE $234 $240 Not Implemented
IA0479 # 01 Y:2012 01 2012 INSTALL OCCUPANCY SENSORS $2,675 $2,732 Implemented
IP0001 # 07 Y:2012 07 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,320 $17,272 Not Implemented
IP0001 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,200 $8,348 Implemented
IP0001 # 03 Y:2012 03 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $93 $0 Implemented
IP0001 # 02 Y:2012 02 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,247 $0 Implemented
IP0001 # 01 Y:2012 01 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $75,906 $0 Not Implemented
IP0001 # 05 Y:2012 05 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,454 $1,300 Not Implemented
IP0001 # 06 Y:2012 06 2012 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $16,942 $80,000 Implemented
SD0447 # 01 Y:2012 01 2012 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $1,132 $320 Not Implemented
SD0447 # 04 Y:2012 04 2012 INSTALL OCCUPANCY SENSORS $472 $640 Not Implemented
SD0447 # 06 Y:2012 06 2012 INSTALL SKYLIGHTS $4,128 $7,660 Not Implemented
SD0447 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,491 $12,231 Not Implemented
SD0447 # 03 Y:2012 03 2012 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $34,656 $38,885 Not Implemented
SD0447 # 02 Y:2012 02 2012 INSTALL SKYLIGHTS $14,679 $13,457 Not Implemented
MAS021 # 05 Y:2012 05 2012 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $4,883 $3,120 Implemented