IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

998

matching recommendations
Reset
SIC 306 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0571 # 02 Y:2024 02 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,674 $140 Implemented
LE0571 # 03 Y:2024 03 2024 INSTALL OCCUPANCY SENSORS $719 $70 Implemented
LE0571 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,911 $1,560 Implemented
LE0571 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $737 $0 Implemented
IC0298 # 09 Y:2024 09 2024 INSULATE BARE EQUIPMENT $259 $259 Implemented
IC0298 # 02 Y:2024 02 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $19,913 $4,400 Implemented
IC0298 # 06 Y:2024 06 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,839 $0 Implemented
IC0298 # 04 Y:2024 04 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $14,618 $558 Implemented
IC0298 # 03 Y:2024 03 2024 INSTALL TIMERS AND/OR THERMOSTATS $3,568 $280 Implemented
IC0298 # 08 Y:2024 08 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $63 $0 Implemented
IC0298 # 07 Y:2024 07 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $352 $0 Implemented
UL2317 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,159 $0 Implemented
UD1072 # 03 Y:2024 03 2024 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $63 $216 Implemented
UD1072 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,892 $12,650 Implemented
UD1072 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,741 $5,000 Implemented
UD1072 # 02 Y:2024 02 2024 INSTALL / REPAIR INSULATION ON STEAM LINES $3,199 $864 Implemented
SJ0010 # 07 Y:2024 07 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $185 $786 Implemented
SJ0010 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $780 $0 Implemented
SJ0010 # 08 Y:2024 08 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $274 $0 Implemented
SJ0010 # 04 Y:2024 04 2024 INSULATE BARE EQUIPMENT $9,629 $1,369 Implemented
SJ0010 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $58 $0 Implemented
UD1069 # 06 Y:2023 06 2023 INSTALL OCCUPANCY SENSORS $1,372 $1,389 Implemented
UD1069 # 02 Y:2023 02 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,796 $300 Implemented
UD1069 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $31,978 $0 Implemented
UD1069 # 08 Y:2023 08 2023 COVER OPEN TANKS $42 $2,000 Implemented