IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

977

matching recommendations
Reset
SIC 306 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0224 # 03 Y:2003 03 2003 OPTIMIZE PLANT POWER FACTOR $21,643 $15,930 Implemented
UM0224 # 04 Y:2003 04 2003 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $51,840 $5,520 Implemented
UM0224 # 05 Y:2003 05 2003 REPAIR AND ELIMINATE STEAM LEAKS $26,100 $7,230 Implemented
UM0224 # 07 Y:2003 07 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $2,606 $934 Implemented
UM0224 # 09 Y:2003 09 2003 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $2,650 $120 Implemented
UM0224 # 12 Y:2003 12 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $31,000 $2,500 Implemented
MA0526 # 07 Y:2003 07 2003 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,169 $0 Implemented
AS0336 # 04 Y:2002 04 2002 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $418 $30 Implemented
AS0336 # 06 Y:2002 06 2002 REUSE / RECYCLE/ SELL PAPER PRODUCTS $9,360 $40 Implemented
AS0336 # 08 Y:2002 08 2002 $72,604 $3,840 Implemented
AS0336 # 09 Y:2002 09 2002 $3,820 $2,080 Implemented
SF0245 # 03 Y:2002 03 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,576 $4,115 Implemented
SF0245 # 04 Y:2002 04 2002 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $8,585 $20,725 Implemented
SF0245 # 06 Y:2002 06 2002 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $2,738 $6,972 Implemented
SF0245 # 07 Y:2002 07 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,193 $0 Implemented
IA0277 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,129 $0 Implemented
IA0277 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,705 $761 Implemented
IA0277 # 08 Y:2001 08 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,004 $5,000 Implemented
IA0277 # 09 Y:2001 09 2001 REPAIR AND ELIMINATE STEAM LEAKS $2,357 $2,400 Implemented
LM0019 # 04 Y:2001 04 2001 $3,087 $450 Implemented
LM0019 # 05 Y:2001 05 2001 $10,000 $3,000 Implemented
UD0629 # 07 Y:2001 07 2001 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $3,907 $0 Implemented
WV0218 # 02 Y:2001 02 2001 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $15,768 $13,800 Implemented
WV0218 # 03 Y:2001 03 2001 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,519 $1,362 Implemented
WV0218 # 04 Y:2001 04 2001 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $121 $60 Implemented