IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

986

matching recommendations
Reset
SIC 306 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0447 # 07 Y:1999 07 1999 INSTALL TIMERS AND/OR THERMOSTATS $473 $748 Implemented
IA0233 # 03 Y:1999 03 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $139 $45 Implemented
IA0233 # 05 Y:1999 05 1999 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,757 $2,000 Implemented
ND0338 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $278 $120 Implemented
ND0338 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $289 $480 Implemented
ND0338 # 04 Y:1999 04 1999 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $318 $272 Implemented
ND0338 # 06 Y:1999 06 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $60 $87 Implemented
ND0333 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $855 $220 Implemented
ND0333 # 05 Y:1999 05 1999 DEVELOP A REPAIR/REPLACE POLICY $8,764 $7,291 Implemented
ND0333 # 06 Y:1999 06 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $212 $480 Implemented
ND0333 # 07 Y:1999 07 1999 USE EVAPORATION TO CONCENTRATE MATERIAL $12,426 $15,500 Implemented
ND0333 # 08 Y:1999 08 1999 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $1,192 $3,600 Implemented
ND0333 # 09 Y:1999 09 1999 PURCHASE EQUIPMENT INSTEAD OF LEASING $11,110 $30,000 Implemented
ND0334 # 01 Y:1999 01 1999 APPLY FOR INVESTMENT INCENTIVES $4,400 $250 Implemented
ND0334 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $358 $560 Implemented
ND0334 # 03 Y:1999 03 1999 PURCHASE RE-CONDITIONED MATERIAL INSTEAD OF NEW $22,061 $57,704 Implemented
ND0334 # 10 Y:1999 10 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $807 $200 Implemented
SD0234 # 04 Y:1999 04 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,069 $1,425 Implemented
GT0664 # 02 Y:1999 02 1999 INSULATE BARE EQUIPMENT $13,210 $19,500 Implemented
GT0664 # 06 Y:1999 06 1999 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,985 $660 Implemented
MA0436 # 02 Y:1999 02 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,170 $27,774 Implemented
MA0436 # 03 Y:1999 03 1999 MODERATE COOLING TOWER OUTLET TEMPERATURE $7,745 $12,435 Implemented
MA0436 # 06 Y:1999 06 1999 INSTALL OCCUPANCY SENSORS $148 $77 Implemented
MA0436 # 07 Y:1999 07 1999 DISCONNECT BALLASTS $60 $100 Implemented
MA0429 # 02 Y:1998 02 1998 TURN OFF EQUIPMENT WHEN NOT IN USE $1,695 $5,302 Implemented