Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
50
matching recommendationsSIC | 306 | Fabricated Rubber Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0451 # 04 Y:2012 | 04 | 2012 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $2,656 | $1,800 | Not Implemented |
NC0451 # 03 Y:2012 | 03 | 2012 | INSTALL OCCUPANCY SENSORS | $252 | $533 | Implemented |
NC0451 # 06 Y:2012 | 06 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $158 | $100 | Implemented |
NC0451 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $444 | $1,674 | Implemented |
NC0451 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,790 | $14,320 | Implemented |
NC0451 # 05 Y:2012 | 05 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,516 | $4,075 | Implemented |
TN0605 # 03 Y:1997 | 03 | 1997 | KEEP BOILER TUBES CLEAN | $39,970 | $70,960 | Implemented |
TN0605 # 04 Y:1997 | 04 | 1997 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $10,910 | $1,330 | Implemented |
TN0605 # 01 Y:1997 | 01 | 1997 | INSTALL EQUIPMENT TO MOVE PRODUCT | $104,110 | $129,700 | Implemented |
TN0605 # 02 Y:1997 | 02 | 1997 | REDUCE SCRAP PRODUCTION | $100,760 | $25,700 | Implemented |
TN0605 # 05 Y:1997 | 05 | 1997 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $10,880 | $25,180 | Not Implemented |
TN0605 # 06 Y:1997 | 06 | 1997 | REUSE / RECYCLE/ SELL RUBBER PRODUCTS | $5,430 | $14,800 | Not Implemented |
NC0084 # 13 Y:1996 | 13 | 1996 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $20,000 | $2,000 | Not Implemented |
NC0084 # 01 Y:1996 | 01 | 1996 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $20,895 | $10,000 | Implemented |
NC0084 # 12 Y:1996 | 12 | 1996 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $25,015 | $18,000 | Implemented |
NC0084 # 11 Y:1996 | 11 | 1996 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $1,960 | $2,000 | Implemented |
NC0084 # 10 Y:1996 | 10 | 1996 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $3,582 | $4,720 | Not Implemented |
NC0084 # 09 Y:1996 | 09 | 1996 | INSULATE BARE EQUIPMENT | $932 | $549 | Implemented |
NC0084 # 08 Y:1996 | 08 | 1996 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,827 | $2,970 | Implemented |
NC0084 # 07 Y:1996 | 07 | 1996 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,284 | $640 | Not Implemented |
NC0084 # 06 Y:1996 | 06 | 1996 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $6,221 | $5,100 | Not Implemented |
NC0084 # 05 Y:1996 | 05 | 1996 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,744 | $600 | Not Implemented |
NC0084 # 04 Y:1996 | 04 | 1996 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,498 | $1,700 | Implemented |
NC0084 # 03 Y:1996 | 03 | 1996 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,833 | $400 | Implemented |
NC0084 # 02 Y:1996 | 02 | 1996 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,441 | $3,000 | Implemented |