IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,116

matching recommendations
Reset
SIC 306 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0204 # 02 Y:2018 02 2018 ADJUST PH FOR NEUTRALIZATION $132,488 $180,000 Implemented
IC0204 # 03 Y:2018 03 2018 REPLACE BOILER $97,199 $211,342 Implemented
IC0204 # 04 Y:2018 04 2018 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $71,357 $8,712 Implemented
IC0204 # 05 Y:2018 05 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $21,223 $0 Implemented
IC0204 # 06 Y:2018 06 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $36,108 $187,206 Implemented
UD0986 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $28,289 $0 Not Implemented
UD0986 # 02 Y:2018 02 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $8,337 $0 Not Implemented
UD0986 # 03 Y:2018 03 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $37,147 $0 Not Implemented
UD0986 # 04 Y:2018 04 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $467 $0 Not Implemented
UD0986 # 05 Y:2018 05 2018 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $455 $0 Not Implemented
UD0986 # 06 Y:2018 06 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,962 $2,000 Not Implemented
UD0986 # 07 Y:2018 07 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,246 $2,080 Not Implemented
UD0986 # 08 Y:2018 08 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $353 $50 Not Implemented
UD0986 # 09 Y:2018 09 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $193 $500 Not Implemented
UD0986 # 10 Y:2018 10 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,539 $17,808 Not Implemented
IP0100 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $31,439 $2 Implemented
IP0100 # 02 Y:2018 02 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,249 $7 Not Implemented
IP0100 # 03 Y:2018 03 2018 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $831 $0 Not Implemented
IP0100 # 04 Y:2018 04 2018 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $12,491 $1,482 Implemented
IP0100 # 05 Y:2018 05 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,641 $800 Implemented
IP0100 # 06 Y:2018 06 2018 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $27,530 $11,407 Not Implemented
IP0100 # 07 Y:2018 07 2018 INSTALL OCCUPANCY SENSORS $323 $87 Implemented
IP0100 # 08 Y:2018 08 2018 OPTIMIZE PLANT POWER FACTOR $59,133 $75,790 Implemented
UA0191 # 01 Y:2018 01 2018 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $18,889 $37,420 Not Implemented
UA0191 # 02 Y:2018 02 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $15,914 $0 Implemented