IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

166

matching recommendations
Reset
SIC 306 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0100 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $31,439 $2 Implemented
IP0100 # 03 Y:2018 03 2018 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $831 $0 Not Implemented
IP0100 # 04 Y:2018 04 2018 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $12,491 $1,482 Implemented
IP0100 # 05 Y:2018 05 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,641 $800 Implemented
IP0100 # 06 Y:2018 06 2018 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $27,530 $11,407 Not Implemented
IP0100 # 07 Y:2018 07 2018 INSTALL OCCUPANCY SENSORS $323 $87 Implemented
IP0100 # 08 Y:2018 08 2018 OPTIMIZE PLANT POWER FACTOR $59,133 $75,790 Implemented
UM0481 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,854 $34,336 n/a
UM0481 # 03 Y:2017 03 2017 INSTALL OCCUPANCY SENSORS $18,599 $6,600 n/a
UM0481 # 01 Y:2017 01 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,978 $3,000 n/a
UM0481 # 04 Y:2017 04 2017 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $50,498 $100,000 n/a
UD0853 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,997 $3,815 Not Implemented
UD0853 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,419 $28,511 Not Implemented
UD0853 # 10 Y:2012 10 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $402 $1,300 Not Implemented
UD0853 # 09 Y:2012 09 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $974 $2,000 Not Implemented
UD0853 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,192 $5,500 Not Implemented
UD0853 # 07 Y:2012 07 2012 RECOVER WASTE HEAT FROM EQUIPMENT $3,012 $1,000 Not Implemented
UD0853 # 12 Y:2012 12 2012 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $7,076 $9,000 Not Implemented
UD0853 # 11 Y:2012 11 2012 COVER OPEN TANKS $4,120 $200 Not Implemented
UD0853 # 08 Y:2012 08 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,506 $1,000 Not Implemented
UD0853 # 03 Y:2012 03 2012 REDUCE WATER USE WITH COUNTER CURRENT RINSING $15,738 $600 Not Implemented
UD0853 # 05 Y:2012 05 2012 UPGRADE CONTROLS ON COMPRESSORS $6,272 $6,000 Not Implemented
UD0853 # 06 Y:2012 06 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,059 $7,000 Not Implemented
ND0348 # 09 Y:2000 09 2000 REUSE / RECYCLE/ SELL RUBBER PRODUCTS $10,000 $200 Not Implemented
ND0348 # 07 Y:2000 07 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $250,000 $40,000 Not Implemented