Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
166
matching recommendationsSIC | 306 | Fabricated Rubber Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0100 # 01 Y:2018 | 01 | 2018 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $31,439 | $2 | Implemented |
IP0100 # 03 Y:2018 | 03 | 2018 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $831 | $0 | Not Implemented |
IP0100 # 04 Y:2018 | 04 | 2018 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $12,491 | $1,482 | Implemented |
IP0100 # 05 Y:2018 | 05 | 2018 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,641 | $800 | Implemented |
IP0100 # 06 Y:2018 | 06 | 2018 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $27,530 | $11,407 | Not Implemented |
IP0100 # 07 Y:2018 | 07 | 2018 | INSTALL OCCUPANCY SENSORS | $323 | $87 | Implemented |
IP0100 # 08 Y:2018 | 08 | 2018 | OPTIMIZE PLANT POWER FACTOR | $59,133 | $75,790 | Implemented |
UM0481 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,854 | $34,336 | n/a |
UM0481 # 03 Y:2017 | 03 | 2017 | INSTALL OCCUPANCY SENSORS | $18,599 | $6,600 | n/a |
UM0481 # 01 Y:2017 | 01 | 2017 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $7,978 | $3,000 | n/a |
UM0481 # 04 Y:2017 | 04 | 2017 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $50,498 | $100,000 | n/a |
UD0853 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,997 | $3,815 | Not Implemented |
UD0853 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $30,419 | $28,511 | Not Implemented |
UD0853 # 10 Y:2012 | 10 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $402 | $1,300 | Not Implemented |
UD0853 # 09 Y:2012 | 09 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $974 | $2,000 | Not Implemented |
UD0853 # 04 Y:2012 | 04 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,192 | $5,500 | Not Implemented |
UD0853 # 07 Y:2012 | 07 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,012 | $1,000 | Not Implemented |
UD0853 # 12 Y:2012 | 12 | 2012 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $7,076 | $9,000 | Not Implemented |
UD0853 # 11 Y:2012 | 11 | 2012 | COVER OPEN TANKS | $4,120 | $200 | Not Implemented |
UD0853 # 08 Y:2012 | 08 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,506 | $1,000 | Not Implemented |
UD0853 # 03 Y:2012 | 03 | 2012 | REDUCE WATER USE WITH COUNTER CURRENT RINSING | $15,738 | $600 | Not Implemented |
UD0853 # 05 Y:2012 | 05 | 2012 | UPGRADE CONTROLS ON COMPRESSORS | $6,272 | $6,000 | Not Implemented |
UD0853 # 06 Y:2012 | 06 | 2012 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,059 | $7,000 | Not Implemented |
ND0348 # 09 Y:2000 | 09 | 2000 | REUSE / RECYCLE/ SELL RUBBER PRODUCTS | $10,000 | $200 | Not Implemented |
ND0348 # 07 Y:2000 | 07 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $250,000 | $40,000 | Not Implemented |