Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
166
matching recommendationsSIC | 306 | Fabricated Rubber Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0100 # 01 Y:2018 | 01 | 2018 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $31,439 | $2 | Implemented |
IP0100 # 03 Y:2018 | 03 | 2018 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $831 | $0 | Not Implemented |
IP0100 # 04 Y:2018 | 04 | 2018 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $12,491 | $1,482 | Implemented |
IP0100 # 05 Y:2018 | 05 | 2018 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,641 | $800 | Implemented |
IP0100 # 06 Y:2018 | 06 | 2018 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $27,530 | $11,407 | Not Implemented |
IP0100 # 07 Y:2018 | 07 | 2018 | INSTALL OCCUPANCY SENSORS | $323 | $87 | Implemented |
IP0100 # 08 Y:2018 | 08 | 2018 | OPTIMIZE PLANT POWER FACTOR | $59,133 | $75,790 | Implemented |
UM0481 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,854 | $34,336 | n/a |
UM0481 # 03 Y:2017 | 03 | 2017 | INSTALL OCCUPANCY SENSORS | $18,599 | $6,600 | n/a |
UM0481 # 01 Y:2017 | 01 | 2017 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $7,978 | $3,000 | n/a |
UM0481 # 04 Y:2017 | 04 | 2017 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $50,498 | $100,000 | n/a |
UD0853 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,997 | $3,815 | Not Implemented |
UD0853 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $30,419 | $28,511 | Not Implemented |
UD0853 # 10 Y:2012 | 10 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $402 | $1,300 | Not Implemented |
UD0853 # 09 Y:2012 | 09 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $974 | $2,000 | Not Implemented |
UD0853 # 04 Y:2012 | 04 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,192 | $5,500 | Not Implemented |
UD0853 # 07 Y:2012 | 07 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,012 | $1,000 | Not Implemented |
UD0853 # 12 Y:2012 | 12 | 2012 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $7,076 | $9,000 | Not Implemented |
UD0853 # 11 Y:2012 | 11 | 2012 | COVER OPEN TANKS | $4,120 | $200 | Not Implemented |
UD0853 # 08 Y:2012 | 08 | 2012 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,506 | $1,000 | Not Implemented |
UD0853 # 03 Y:2012 | 03 | 2012 | REDUCE WATER USE WITH COUNTER CURRENT RINSING | $15,738 | $600 | Not Implemented |
UD0853 # 05 Y:2012 | 05 | 2012 | UPGRADE CONTROLS ON COMPRESSORS | $6,272 | $6,000 | Not Implemented |
UD0853 # 06 Y:2012 | 06 | 2012 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,059 | $7,000 | Not Implemented |
ND0348 # 09 Y:2000 | 09 | 2000 | REUSE / RECYCLE/ SELL RUBBER PRODUCTS | $10,000 | $200 | Not Implemented |
ND0348 # 07 Y:2000 | 07 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $250,000 | $40,000 | Not Implemented |