IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

196

matching recommendations
Reset
SIC 306 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0390 # 16 Y:2010 16 2010 INSTALL OCCUPANCY SENSORS $2,946 $75 Not Implemented
SF0390 # 15 Y:2010 15 2010 USE PHOTOCELL CONTROLS $1,030 $2,587 Implemented
SF0390 # 14 Y:2010 14 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $846 $1,500 Not Implemented
SF0390 # 13 Y:2010 13 2010 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $39,251 $58,106 Implemented
SF0390 # 12 Y:2010 12 2010 USE COMPRESSOR AIR FILTERS $2,168 $3,000 Implemented
SF0390 # 11 Y:2010 11 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,039 $2,749 Implemented
SF0390 # 10 Y:2010 10 2010 INSULATE BARE EQUIPMENT $996 $821 Not Implemented
SF0390 # 09 Y:2010 09 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $326 $261 Not Implemented
SF0390 # 08 Y:2010 08 2010 INSULATE BARE EQUIPMENT $4,611 $2,176 Not Implemented
SF0390 # 07 Y:2010 07 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,024 $5,560 Implemented
SF0390 # 06 Y:2010 06 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,991 $789 Implemented
SF0390 # 05 Y:2010 05 2010 INSULATE BARE EQUIPMENT $24,404 $7,250 Implemented
SF0390 # 03 Y:2010 03 2010 AIR CONDITION ONLY SPACE NECESSARY $14,706 $3,207 Implemented
SF0390 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,828 $0 Implemented
SF0390 # 01 Y:2010 01 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,708 $0 Implemented
SF0351 # 05 Y:2008 05 2008 INSULATE BARE EQUIPMENT $584 $0 Not Implemented
SF0351 # 10 Y:2008 10 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,144 $1,792 Not Implemented
SF0351 # 04 Y:2008 04 2008 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,173 $0 Not Implemented
SF0351 # 03 Y:2008 03 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,240 $150 Not Implemented
SF0351 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,336 $0 Implemented
SF0351 # 01 Y:2008 01 2008 REPAIR AND ELIMINATE STEAM LEAKS $3,571 $0 Implemented
SF0351 # 09 Y:2008 09 2008 REDUCE EXCESSIVE BOILER BLOWDOWN $1,877 $2,802 Not Implemented
SF0351 # 12 Y:2008 12 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,836 $93,064 Implemented
SF0351 # 11 Y:2008 11 2008 INSULATE BARE EQUIPMENT $493 $979 Not Implemented
SF0351 # 06 Y:2008 06 2008 INSTALL OCCUPANCY SENSORS $2,396 $290 Not Implemented