IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
SIC 306 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0191 # 08 Y:2018 08 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,092 $2,256 Not Implemented
UA0191 # 07 Y:2018 07 2018 RECOVER WASTE HEAT FROM EQUIPMENT $489 $2,112 Not Implemented
UA0191 # 06 Y:2018 06 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,997 $0 Implemented
UA0191 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,391 $150 Not Implemented
UA0191 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,326 $2,165 Implemented
UA0191 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,060 $34,939 Not Implemented
UA0191 # 02 Y:2018 02 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $15,914 $0 Implemented
UA0191 # 01 Y:2018 01 2018 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $18,889 $37,420 Not Implemented
UA0024 # 05 Y:2008 05 2008 REPAIR AND ELIMINATE STEAM LEAKS $6,203 $300 Implemented
UA0024 # 09 Y:2008 09 2008 RECOVER WASTE HEAT FROM EQUIPMENT $42,744 $45,700 Not Implemented
UA0024 # 08 Y:2008 08 2008 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $24,566 $23,000 Not Implemented
UA0024 # 07 Y:2008 07 2008 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $98,000 $126,000 Not Implemented
UA0024 # 06 Y:2008 06 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $4,555 $2,415 Implemented
UA0024 # 04 Y:2008 04 2008 DISCONNECT BALLASTS $1,392 $243 Implemented
UA0024 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,199 $14,155 Not Implemented
UA0024 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,878 $1,500 Implemented
UA0024 # 01 Y:2008 01 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,342 $0 Implemented
GT0479 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,282 $18,910 Not Implemented
GT0479 # 08 Y:1992 08 1992 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $88,450 $133,000 Not Implemented
GT0479 # 07 Y:1992 07 1992 INCREASE AMOUNT OF CONDENSATE RETURNED $1,392 $1,250 Not Implemented
GT0479 # 06 Y:1992 06 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $17,000 $450 Not Implemented
GT0479 # 05 Y:1992 05 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,086 $450 Not Implemented
GT0479 # 04 Y:1992 04 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,378 $28,850 Not Implemented
GT0479 # 03 Y:1992 03 1992 INSULATE BARE EQUIPMENT $16,146 $20,488 Not Implemented
GT0479 # 02 Y:1992 02 1992 INSTALL TIMERS AND/OR THERMOSTATS $2,180 $1,480 Not Implemented