Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

86

matching recommendations
Reset
SIC 306 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0917 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,019 $6,287 Not Implemented
OK0917 # 06 Y:2015 06 2015 USE OPTIMUM TEMPERATURE $8,870 $180 Implemented
OK0917 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $689 $577 Implemented
OK0917 # 04 Y:2015 04 2015 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $4,875 $2,000 Implemented
OK0917 # 03 Y:2015 03 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $537 $55 Implemented
OK0917 # 02 Y:2015 02 2015 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,154 $72 Implemented
OK0863 # 02 Y:2013 02 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,069 $22,428 Not Implemented
OK0863 # 04 Y:2013 04 2013 INSULATE BARE EQUIPMENT $10,721 $1,250 Not Implemented
OK0863 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $3,208 $4,450 Not Implemented
OK0863 # 01 Y:2013 01 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,703 $2,500 Not Implemented
OK0825 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,478 $1,500 Implemented
OK0825 # 09 Y:2012 09 2012 SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS $15,683 $15,683 Not Implemented
OK0825 # 04 Y:2012 04 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $19,699 $65,000 Not Implemented
OK0825 # 03 Y:2012 03 2012 INSTALL OCCUPANCY SENSORS $194 $3,150 Not Implemented
OK0825 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,541 $68,775 Implemented
OK0825 # 01 Y:2012 01 2012 REPLACE BOILER $228,516 $1,085,000 Not Implemented
OK0825 # 06 Y:2012 06 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,119 $538 Implemented
OK0825 # 07 Y:2012 07 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,300 $450 Not Implemented
OK0825 # 11 Y:2012 11 2012 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $8,292 $406,800 Not Implemented
OK0825 # 08 Y:2012 08 2012 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $62,755 $31,500 Not Implemented
OK0825 # 10 Y:2012 10 2012 INSTALL SET-BACK TIMERS $929 $937 Not Implemented
OK0825 # 12 Y:2012 12 2012 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $6,335 $0 Not Implemented
LL0334 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $50,263 $9,960 Not Implemented
LL0334 # 02 Y:2010 02 2010 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $113,009 $24,500 Not Implemented
LL0334 # 01 Y:2010 01 2010 REPAIR AND ELIMINATE STEAM LEAKS $295,797 $2,920 Not Implemented