Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
40
matching recommendationsSIC | 306 | Fabricated Rubber Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0917 # 02 Y:2015 | 02 | 2015 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $4,154 | $72 | Implemented |
OK0917 # 05 Y:2015 | 05 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $689 | $577 | Implemented |
OK0917 # 03 Y:2015 | 03 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $537 | $55 | Implemented |
OK0917 # 04 Y:2015 | 04 | 2015 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $4,875 | $2,000 | Implemented |
OK0917 # 06 Y:2015 | 06 | 2015 | USE OPTIMUM TEMPERATURE | $8,870 | $180 | Implemented |
OK0825 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,541 | $68,775 | Implemented |
OK0825 # 05 Y:2012 | 05 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,478 | $1,500 | Implemented |
OK0825 # 06 Y:2012 | 06 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,119 | $538 | Implemented |
OK0756 # 03 Y:2008 | 03 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,491 | $1,000 | Implemented |
AR0124 # 08 Y:1997 | 08 | 1997 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $950 | $100 | Implemented |
AR0124 # 07 Y:1997 | 07 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,103 | $1,238 | Implemented |
AR0124 # 06 Y:1997 | 06 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $376 | $100 | Implemented |
AR0124 # 05 Y:1997 | 05 | 1997 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,903 | $0 | Implemented |
AR0124 # 04 Y:1997 | 04 | 1997 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $2,617 | $100 | Implemented |
AR0124 # 01 Y:1997 | 01 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $757 | $120 | Implemented |
AR0097 # 05 Y:1996 | 05 | 1996 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $929 | $0 | Implemented |
AR0097 # 08 Y:1996 | 08 | 1996 | MINIMIZE WATER USAGE | $1,489 | $1,000 | Implemented |
AR0097 # 07 Y:1996 | 07 | 1996 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $13,027 | $4,900 | Implemented |
AR0097 # 06 Y:1996 | 06 | 1996 | OPTIMIZE PLANT POWER FACTOR | $5,388 | $1,000 | Implemented |
AR0097 # 02 Y:1996 | 02 | 1996 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,496 | $11,870 | Implemented |
AR0097 # 01 Y:1996 | 01 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,485 | $120 | Implemented |
AR0091 # 12 Y:1996 | 12 | 1996 | MODIFY MATERIAL APPLICATION METHODS | $45,625 | $0 | Implemented |
AR0091 # 10 Y:1996 | 10 | 1996 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $152,084 | $1,000 | Implemented |
AR0091 # 08 Y:1996 | 08 | 1996 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,839 | $1,000 | Implemented |
AR0091 # 05 Y:1996 | 05 | 1996 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $365 | $0 | Implemented |