IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

60

matching recommendations
Reset
SIC 306 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UC2402 # 04 Y:2024 04 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,943 $1,040 n/a
UC2402 # 03 Y:2024 03 2024 INSTALL / REPAIR INSULATION ON STEAM LINES $1,298 $3,327 n/a
UC2402 # 02 Y:2024 02 2024 USE BATTERY STORAGE FOR DEMAND CONTROL $7,849 $31,027 n/a
UC2402 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $17,049 $134,289 n/a
UC2402 # 05 Y:2024 05 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,261 $150 n/a
UC2402 # 09 Y:2024 09 2024 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $6,701 $64,088 n/a
UC2402 # 06 Y:2024 06 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,612 $30 n/a
UC2402 # 08 Y:2024 08 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,934 $155 n/a
UC2402 # 07 Y:2024 07 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $419 $1,300 n/a
MA0438 # 02 Y:1999 02 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,856 $4,925 Not Implemented
MA0438 # 01 Y:1999 01 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,011 $6,075 Not Implemented
MA0438 # 03 Y:1999 03 1999 MODERATE COOLING TOWER OUTLET TEMPERATURE $1,055 $3,400 Not Implemented
MA0436 # 03 Y:1999 03 1999 MODERATE COOLING TOWER OUTLET TEMPERATURE $7,745 $12,435 Implemented
MA0436 # 01 Y:1999 01 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $35,895 $41,600 Not Implemented
MA0436 # 02 Y:1999 02 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,170 $27,774 Implemented
MA0436 # 07 Y:1999 07 1999 DISCONNECT BALLASTS $60 $100 Implemented
MA0436 # 04 Y:1999 04 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $15,831 $44,552 Not Implemented
MA0436 # 05 Y:1999 05 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $16,698 $75,790 Not Implemented
MA0436 # 06 Y:1999 06 1999 INSTALL OCCUPANCY SENSORS $148 $77 Implemented
MA0335 # 02 Y:1995 02 1995 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $1,479 $3,771 Not Implemented
MA0335 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,352 $1,790 Implemented
MA0335 # 06 Y:1995 06 1995 INSTALL OCCUPANCY SENSORS $449 $898 Not Implemented
MA0335 # 08 Y:1995 08 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $318 $0 Implemented
MA0335 # 07 Y:1995 07 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $370 $0 Not Implemented
MA0335 # 09 Y:1995 09 1995 COMBINE UTILITY METERS $300 $0 Implemented