IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

49

matching recommendations
Reset
SIC 306 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MU0060 # 10 Y:2025 10 2025 USE SOLAR HEAT TO MAKE ELECTRICTY $42,322 $490,355 n/a
MU0060 # 09 Y:2025 09 2025 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $14,407 $66,000 n/a
MU0060 # 08 Y:2025 08 2025 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $1,220 $5,000 n/a
MU0060 # 07 Y:2025 07 2025 USE SQUEEGEES, MOPS, AND VACUUMS FOR FLOOR CLEANING $1,733 $5,000 n/a
MU0060 # 06 Y:2025 06 2025 USE AUTOMATIC CLEANING EQUIPMENT $44,873 $110,000 n/a
MU0060 # 01 Y:2025 01 2025 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $328 $0 n/a
MU0060 # 02 Y:2025 02 2025 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $126,131 $8,400 n/a
MU0060 # 03 Y:2025 03 2025 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $1,517 $1,184 n/a
MU0060 # 04 Y:2025 04 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,778 $24,085 n/a
MU0060 # 05 Y:2025 05 2025 UPGRADE OBSOLETE EQUIPMENT $76,249 $151,800 n/a
IC0204 # 02 Y:2018 02 2018 ADJUST PH FOR NEUTRALIZATION $132,488 $180,000 Implemented
IC0204 # 06 Y:2018 06 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $36,108 $187,206 Implemented
IC0204 # 05 Y:2018 05 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $21,223 $0 Implemented
IC0204 # 04 Y:2018 04 2018 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $71,357 $8,712 Implemented
IC0204 # 03 Y:2018 03 2018 REPLACE BOILER $97,199 $211,342 Implemented
IC0204 # 01 Y:2018 01 2018 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $71,958 $100,000 Implemented
IC0171 # 07 Y:2010 07 2010 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $2,143 $1,178 Not Implemented
IC0171 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $91 $58 Not Implemented
IC0171 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,901 $6,914 Not Implemented
IC0171 # 09 Y:2010 09 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $324 $1 Implemented
IC0171 # 08 Y:2010 08 2010 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $438 $1 Not Implemented
IC0171 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,545 $345 Implemented
IC0171 # 04 Y:2010 04 2010 INSTALL OCCUPANCY SENSORS $517 $1,317 Not Implemented
IC0171 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,223 $99,311 Implemented
IC0171 # 06 Y:2010 06 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,860 $5,879 Not Implemented