IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

66

matching recommendations
Reset
SIC 306 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0313 # 12 Y:2024 12 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $81,048 $301,095 n/a
TT0313 # 11 Y:2024 11 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $92,752 $120,000 n/a
TT0313 # 10 Y:2024 10 2024 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $261,275 $200,000 n/a
TT0313 # 09 Y:2024 09 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,234 $9,800 n/a
TT0313 # 08 Y:2024 08 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,284 $1,200 n/a
TT0313 # 07 Y:2024 07 2024 RECOVER WASTE HEAT FROM EQUIPMENT $29,164 $15,000 n/a
TT0313 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,143 $60 n/a
TT0313 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $34,255 $2,625 n/a
TT0313 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN WATER LINES AND VALVES $4,207 $340 n/a
TT0313 # 04 Y:2024 04 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $21,724 $2,600 n/a
TT0313 # 05 Y:2024 05 2024 INSULATE BARE EQUIPMENT $640 $87 n/a
TT0313 # 06 Y:2024 06 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,134 $3,000 n/a
TT0140 # 08 Y:2014 08 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $3,333 $50 Implemented
TT0140 # 01 Y:2014 01 2014 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $3,000 $2,000 Implemented
TT0140 # 05 Y:2014 05 2014 OPTIMIZE PLANT POWER FACTOR $25,238 $36,000 Implemented
TT0140 # 06 Y:2014 06 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,930 $825 Not Implemented
TT0140 # 07 Y:2014 07 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,206 $125 Implemented
TT0140 # 09 Y:2014 09 2014 DISCONNECT BALLASTS $358 $50 Implemented
TT0140 # 02 Y:2014 02 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $1,068 $1,545 Implemented
TT0140 # 04 Y:2014 04 2014 PREHEAT COMBUSTION AIR WITH WASTE HEAT $2,430 $4,000 Not Implemented
TT0140 # 03 Y:2014 03 2014 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $4,428 $8,000 Not Implemented
TT0015 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,236 $99,598 Not Implemented
TT0015 # 02 Y:2007 02 2007 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $17,800 $35,600 Not Implemented
TT0015 # 01 Y:2007 01 2007 OPTIMIZE PLANT POWER FACTOR $8,343 $10,000 Not Implemented
TT0015 # 03 Y:2007 03 2007 REPAIR OR REPLACE STEAM TRAPS $2,000 $1,600 Implemented