Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
102
matching recommendationsSIC | 306 | Fabricated Rubber Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0649 # 01 Y:1998 | 01 | 1998 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $66,324 | $81,400 | Not Implemented |
GT0649 # 02 Y:1998 | 02 | 1998 | COMBINE UTILITY METERS | $2,240 | $0 | Not Implemented |
GT0649 # 03 Y:1998 | 03 | 1998 | INSULATE BARE EQUIPMENT | $1,648 | $1,050 | Not Implemented |
GT0649 # 06 Y:1998 | 06 | 1998 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $289,504 | $27,000 | Not Implemented |
GT0649 # 08 Y:1998 | 08 | 1998 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $3,046 | $0 | Not Implemented |
GT0649 # 09 Y:1998 | 09 | 1998 | ELIMINATE PRACTICE OF MIXING WASTE STREAMS | $4,100 | $1,000 | Not Implemented |
GT0649 # 07 Y:1998 | 07 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,456 | $6,189 | Not Implemented |
GT0649 # 05 Y:1998 | 05 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,544 | $17,439 | Not Implemented |
GT0649 # 04 Y:1998 | 04 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,426 | $150 | Not Implemented |
MA0429 # 02 Y:1998 | 02 | 1998 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,695 | $5,302 | Implemented |
MA0429 # 01 Y:1998 | 01 | 1998 | IMPROVE SPACE COMFORT CONDITIONING | $14,812 | $19,107 | Not Implemented |
MA0429 # 04 Y:1998 | 04 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $412 | $60 | Implemented |
MA0429 # 03 Y:1998 | 03 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $268 | $0 | Implemented |
MA0429 # 06 Y:1998 | 06 | 1998 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $268 | $130 | Not Implemented |
MA0429 # 05 Y:1998 | 05 | 1998 | INSTALL / REPAIR INSULATION ON STEAM LINES | $269 | $66 | Not Implemented |
WV0154 # 01 Y:1998 | 01 | 1998 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,075 | $2,580 | Not Implemented |
WV0154 # 09 Y:1998 | 09 | 1998 | CLEAR AND RENT EXISTING SPACE | $180,000 | $4,000 | Not Implemented |
WV0154 # 02 Y:1998 | 02 | 1998 | INSULATE BARE EQUIPMENT | $16,667 | $9,432 | Not Implemented |
WV0154 # 08 Y:1998 | 08 | 1998 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $1,940 | $550 | Not Implemented |
WV0154 # 07 Y:1998 | 07 | 1998 | RECOVER AND REUSE COOLING WATER | $670 | $1,525 | Not Implemented |
WV0154 # 05 Y:1998 | 05 | 1998 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $162 | $550 | Not Implemented |
WV0154 # 03 Y:1998 | 03 | 1998 | INSULATE BARE EQUIPMENT | $4,282 | $5,130 | Not Implemented |
WV0154 # 06 Y:1998 | 06 | 1998 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $142 | $220 | Not Implemented |
WV0154 # 04 Y:1998 | 04 | 1998 | INSTALL / REPAIR INSULATION ON STEAM LINES | $322 | $482 | Not Implemented |
WV0149 # 09 Y:1998 | 09 | 1998 | INSULATE BARE EQUIPMENT | $411 | $320 | Implemented |