Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
76
matching recommendationsSIC | 306 | Fabricated Rubber Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TR0058 # 04 Y:2023 | 04 | 2023 | METER WASTE WATER | $408 | $1,511 | n/a |
TR0058 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $727 | $2,781 | n/a |
TR0058 # 02 Y:2023 | 02 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,706 | $7,350 | n/a |
TR0058 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $31,832 | $216,216 | n/a |
UL2317 # 04 Y:2023 | 04 | 2023 | INSTALL SPECTRAL REFLECTORS / DELAMP | $2,720 | $500 | n/a |
UL2317 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,022 | $2,077 | n/a |
UL2317 # 02 Y:2023 | 02 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,159 | $0 | n/a |
UL2317 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $16,039 | $148,666 | n/a |
UL2317 # 05 Y:2023 | 05 | 2023 | OPTIMIZE PLANT POWER FACTOR | $6,865 | $9,100 | n/a |
UD1069 # 01 Y:2023 | 01 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $31,978 | $0 | Implemented |
UD1069 # 02 Y:2023 | 02 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,796 | $300 | Implemented |
UD1069 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,461 | $952 | Implemented |
UD1069 # 04 Y:2023 | 04 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,894 | $1,403 | Implemented |
UD1069 # 05 Y:2023 | 05 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $1,799 | $0 | Not Implemented |
UD1069 # 06 Y:2023 | 06 | 2023 | INSTALL OCCUPANCY SENSORS | $1,372 | $1,389 | Implemented |
UD1069 # 07 Y:2023 | 07 | 2023 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $51,914 | $75,982 | Not Implemented |
UD1069 # 08 Y:2023 | 08 | 2023 | COVER OPEN TANKS | $42 | $2,000 | Implemented |
WV0653 # 04 Y:2023 | 04 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $33,555 | $52,800 | Implemented |
WV0653 # 05 Y:2023 | 05 | 2023 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $27,203 | $93,600 | Not Implemented |
WV0653 # 03 Y:2023 | 03 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $38,158 | $64,250 | Implemented |
WV0653 # 08 Y:2023 | 08 | 2023 | DEVELOP A REPAIR/REPLACE POLICY | $10,683 | $9,567 | Implemented |
WV0653 # 06 Y:2023 | 06 | 2023 | MINIMIZE WATER USAGE | $13,630 | $45,516 | Implemented |
WV0653 # 17 Y:2023 | 17 | 2023 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $1,453 | $7,240 | Not Implemented |
WV0653 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $75,356 | $210,000 | Not Implemented |
WV0653 # 07 Y:2023 | 07 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,961 | $800 | Implemented |