IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

225

matching recommendations
Reset
SIC 3061 Mechanical Rubber Goods
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0078 # 05 Y:2023 05 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $812 $2,080 Implemented
NL0078 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,587 $2,300 Implemented
NL0078 # 02 Y:2023 02 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $10,358 $17,280 Implemented
NL0078 # 01 Y:2023 01 2023 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $31,345 $100,000 Implemented
NL0078 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $270 $415 Implemented
NL0078 # 06 Y:2023 06 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $658 $80 Implemented
NL0078 # 08 Y:2023 08 2023 METER WASTE WATER $128 $250 Implemented
MA0853 # 05 Y:2023 05 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,613 $59,377 Implemented
MA0853 # 03 Y:2023 03 2023 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $7,672 $30,500 Implemented
MA0853 # 06 Y:2023 06 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,336 $24,300 Implemented
MA0853 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,202 $18,988 Implemented
AM0853 # 10 Y:2022 10 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $340 $300 Implemented
AM0853 # 09 Y:2022 09 2022 USE SYNTHETIC LUBRICANT $830 $500 Implemented
AM0853 # 08 Y:2022 08 2022 INSTALL OCCUPANCY SENSORS $1,170 $345 Implemented
AM0853 # 07 Y:2022 07 2022 REPAIR OR REPLACE STEAM TRAPS $2,070 $275 Implemented
AM0853 # 05 Y:2022 05 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,715 $500 Implemented
AM0853 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,530 $13,140 Implemented
AM0853 # 01 Y:2022 01 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $74,850 $5,000 Implemented
WV0615 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,040 $233 Implemented
WV0615 # 05 Y:2021 05 2021 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,781 $2,300 Implemented
WV0615 # 07 Y:2021 07 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $944 $70 Implemented
WV0615 # 10 Y:2021 10 2021 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $307 $1,000 Implemented
WV0615 # 06 Y:2021 06 2021 DEVELOP A REPAIR/REPLACE POLICY $2,598 $5,175 Implemented
WV0615 # 08 Y:2021 08 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $913 $688 Implemented
UD1013 # 06 Y:2020 06 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,346 $1,000 Implemented