IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
SIC 3061 Mechanical Rubber Goods
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0825 # 12 Y:2012 12 2012 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $6,335 $0 Not Implemented
OK0825 # 01 Y:2012 01 2012 REPLACE BOILER $228,516 $1,085,000 Not Implemented
OK0825 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,541 $68,775 Implemented
OK0825 # 03 Y:2012 03 2012 INSTALL OCCUPANCY SENSORS $194 $3,150 Not Implemented
OK0825 # 04 Y:2012 04 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $19,699 $65,000 Not Implemented
OK0825 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,478 $1,500 Implemented
OK0825 # 06 Y:2012 06 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,119 $538 Implemented
OK0825 # 07 Y:2012 07 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,300 $450 Not Implemented
OK0825 # 08 Y:2012 08 2012 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $62,755 $31,500 Not Implemented
OK0825 # 09 Y:2012 09 2012 SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS $15,683 $15,683 Not Implemented
OK0825 # 10 Y:2012 10 2012 INSTALL SET-BACK TIMERS $929 $937 Not Implemented
OK0825 # 11 Y:2012 11 2012 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $8,292 $406,800 Not Implemented
LL0334 # 05 Y:2010 05 2010 INSULATE BARE EQUIPMENT $1,325 $570 Not Implemented
LL0334 # 09 Y:2010 09 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $38 $19 Not Implemented
LL0334 # 08 Y:2010 08 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $664 $646 Not Implemented
LL0334 # 07 Y:2010 07 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $603 $290 Not Implemented
LL0334 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $522 $630 Not Implemented
LL0334 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,974 $9,555 Not Implemented
LL0334 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $50,263 $9,960 Not Implemented
LL0334 # 02 Y:2010 02 2010 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $113,009 $24,500 Not Implemented
LL0334 # 01 Y:2010 01 2010 REPAIR AND ELIMINATE STEAM LEAKS $295,797 $2,920 Not Implemented
AR0091 # 01 Y:1996 01 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $10,763 $1,784 Not Implemented
AR0091 # 12 Y:1996 12 1996 MODIFY MATERIAL APPLICATION METHODS $45,625 $0 Implemented
AR0091 # 11 Y:1996 11 1996 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $39,367 $8,000 Implemented
AR0091 # 10 Y:1996 10 1996 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $152,084 $1,000 Implemented