Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
SIC 3069 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0597 # 09 Y:2023 09 2023 IMPROVE SPACE COMFORT CONDITIONING $35,500 $4,261 Implemented
UF0597 # 08 Y:2023 08 2023 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $51,744 $18,218 Implemented
UF0597 # 07 Y:2023 07 2023 INSTALL OCCUPANCY SENSORS $1,699 $4,994 Implemented
UF0597 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,382 $13,706 Implemented
UF0597 # 05 Y:2023 05 2023 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $3,959 $11,134 Implemented
UF0597 # 04 Y:2023 04 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $6,142 $22,000 Implemented
UF0597 # 03 Y:2023 03 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $9,612 $25,370 Implemented
UF0597 # 02 Y:2023 02 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,736 $15,722 Implemented
UF0597 # 01 Y:2023 01 2023 USE DEMAND CONTROLLER OR LOAD SHEDDER $20,876 $14,705 Implemented
UF0509 # 06 Y:2017 06 2017 INSTALL OCCUPANCY SENSORS $1,241 $1,280 Implemented
UF0509 # 07 Y:2017 07 2017 AVOID CONTAMINATION OF END PIECES AND REUSE AS FEED STOCK $42,000 $0 Implemented
UF0509 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,130 $3,321 Implemented
UF0509 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,157 $844 Implemented
UF0509 # 03 Y:2017 03 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,560 $0 Implemented
MI0205 # 05 Y:2011 05 2011 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,114 $2,500 Implemented
MI0158 # 01 Y:2007 01 2007 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $92,023 $8,580 Implemented
MI0158 # 10 Y:2007 10 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,886 $2,000 Implemented
MI0158 # 09 Y:2007 09 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,073 $40 Implemented
MI0158 # 06 Y:2007 06 2007 REPAIR OR REPLACE STEAM TRAPS $13,330 $1,700 Implemented
MI0158 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,507 $1,210 Implemented
MI0158 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,963 $20,900 Implemented
MI0158 # 02 Y:2007 02 2007 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $55,437 $101,347 Implemented