IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

50

matching recommendations
Reset
SIC 3069 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UC2402 # 09 Y:2024 09 2024 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $6,701 $64,088 n/a
UC2402 # 08 Y:2024 08 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,934 $155 n/a
UC2402 # 07 Y:2024 07 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $419 $1,300 n/a
UC2402 # 06 Y:2024 06 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,612 $30 n/a
UC2402 # 05 Y:2024 05 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,261 $150 n/a
UC2402 # 04 Y:2024 04 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,943 $1,040 n/a
UC2402 # 03 Y:2024 03 2024 INSTALL / REPAIR INSULATION ON STEAM LINES $1,298 $3,327 n/a
UC2402 # 02 Y:2024 02 2024 USE BATTERY STORAGE FOR DEMAND CONTROL $7,849 $31,027 n/a
UC2402 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $17,049 $134,289 n/a
MA0335 # 07 Y:1995 07 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $370 $0 Not Implemented
MA0335 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,545 $5,433 Implemented
MA0335 # 02 Y:1995 02 1995 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $1,479 $3,771 Not Implemented
MA0335 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,352 $1,790 Implemented
MA0335 # 04 Y:1995 04 1995 OPERATE BOILERS ON HIGH FIRE SETTING $662 $400 Implemented
MA0335 # 05 Y:1995 05 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $550 $1,199 Not Implemented
MA0335 # 06 Y:1995 06 1995 INSTALL OCCUPANCY SENSORS $449 $898 Not Implemented
MA0335 # 08 Y:1995 08 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $318 $0 Implemented
MA0335 # 09 Y:1995 09 1995 COMBINE UTILITY METERS $300 $0 Implemented
MA0308 # 04 Y:1994 04 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $441 $110 Implemented
MA0308 # 03 Y:1994 03 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,420 $7,745 Not Implemented
MA0308 # 02 Y:1994 02 1994 REPAIR OR REPLACE STEAM TRAPS $19,471 $813 Implemented
MA0308 # 01 Y:1994 01 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $87,650 $18,145 Implemented
MA0228 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,585 $15,000 Not Implemented
MA0228 # 06 Y:1991 06 1991 INSULATE BARE EQUIPMENT $458 $430 Implemented
MA0228 # 05 Y:1991 05 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $891 $400 Implemented