Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
55
matching recommendationsSIC | 3069 | Fabricated Rubber Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0768 # 09 Y:2016 | 09 | 2016 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $122 | $300 | Not Implemented |
MA0768 # 01 Y:2016 | 01 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,870 | $3,830 | Not Implemented |
MA0768 # 02 Y:2016 | 02 | 2016 | INSTALL / REPAIR INSULATION ON STEAM LINES | $939 | $3,914 | Implemented |
MA0768 # 03 Y:2016 | 03 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $871 | $1,000 | Implemented |
MA0768 # 04 Y:2016 | 04 | 2016 | MINIMIZE WATER USAGE | $587 | $3,650 | Implemented |
MA0768 # 05 Y:2016 | 05 | 2016 | OPTIMIZE PLANT POWER FACTOR | $515 | $3,480 | Not Implemented |
MA0768 # 06 Y:2016 | 06 | 2016 | CLOSE OFF UNNEEDED STEAM LINES | $376 | $4,348 | Implemented |
MA0768 # 07 Y:2016 | 07 | 2016 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $331 | $2,648 | Not Implemented |
MA0768 # 08 Y:2016 | 08 | 2016 | INSTALL / REPAIR INSULATION ON STEAM LINES | $313 | $1,944 | Implemented |
MA0450 # 01 Y:1999 | 01 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $75,618 | $250,000 | Not Implemented |
MA0450 # 03 Y:1999 | 03 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,892 | $5,813 | Implemented |
MA0450 # 02 Y:1999 | 02 | 1999 | INSTALL OCCUPANCY SENSORS | $1,042 | $1,000 | Implemented |
MA0450 # 05 Y:1999 | 05 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,423 | $5,216 | Implemented |
MA0450 # 06 Y:1999 | 06 | 1999 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $537 | $0 | Implemented |
MA0450 # 04 Y:1999 | 04 | 1999 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $456 | $1,275 | Not Implemented |
MA0447 # 04 Y:1999 | 04 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,321 | $45,420 | Not Implemented |
MA0447 # 07 Y:1999 | 07 | 1999 | INSTALL TIMERS AND/OR THERMOSTATS | $473 | $748 | Implemented |
MA0447 # 08 Y:1999 | 08 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $940 | $5,925 | Not Implemented |
MA0447 # 05 Y:1999 | 05 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $591 | $120 | Implemented |
MA0447 # 06 Y:1999 | 06 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $504 | $455 | Not Implemented |
MA0447 # 03 Y:1999 | 03 | 1999 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $1,511 | $2,500 | Not Implemented |
MA0447 # 02 Y:1999 | 02 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,131 | $4,925 | Implemented |
MA0447 # 01 Y:1999 | 01 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,407 | $19,500 | Not Implemented |
MA0328 # 10 Y:1995 | 10 | 1995 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $12,875 | $19,300 | Not Implemented |
MA0328 # 11 Y:1995 | 11 | 1995 | RECOVER AND REUSE COOLING WATER | $11,258 | $14,000 | Not Implemented |