IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,537

matching recommendations
Reset
SIC 3069 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0853 # 06 Y:2012 06 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,059 $7,000 Not Implemented
UD0853 # 07 Y:2012 07 2012 RECOVER WASTE HEAT FROM EQUIPMENT $3,012 $1,000 Not Implemented
UD0853 # 08 Y:2012 08 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,506 $1,000 Not Implemented
UD0853 # 09 Y:2012 09 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $974 $2,000 Not Implemented
UD0853 # 10 Y:2012 10 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $402 $1,300 Not Implemented
UD0853 # 11 Y:2012 11 2012 COVER OPEN TANKS $4,120 $200 Not Implemented
UD0853 # 12 Y:2012 12 2012 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $7,076 $9,000 Not Implemented
SF0402 # 01 Y:2011 01 2011 USE PHOTOCELL CONTROLS $1,438 $3,737 Not Implemented
SF0402 # 02 Y:2011 02 2011 INSTALL OCCUPANCY SENSORS $2,857 $10,811 Not Implemented
SF0402 # 03 Y:2011 03 2011 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $5,402 $23,288 Not Implemented
SF0402 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,789 $29,916 Not Implemented
SF0402 # 05 Y:2011 05 2011 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $766 $4,483 Not Implemented
SF0402 # 06 Y:2011 06 2011 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,637 $11,070 Not Implemented
MI0205 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,634 $38,332 Not Implemented
MI0205 # 02 Y:2011 02 2011 INSTALL / REPAIR INSULATION ON STEAM LINES $8,973 $1,984 Not Implemented
MI0205 # 03 Y:2011 03 2011 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $4,980 $18,280 Not Implemented
MI0205 # 04 Y:2011 04 2011 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,662 $17,186 Not Implemented
MI0205 # 05 Y:2011 05 2011 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,114 $2,500 Implemented
MI0205 # 06 Y:2011 06 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,412 $1,320 Not Implemented
SF0390 # 01 Y:2010 01 2010 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,708 $0 Implemented
SF0390 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,828 $0 Implemented
SF0390 # 03 Y:2010 03 2010 AIR CONDITION ONLY SPACE NECESSARY $14,706 $3,207 Implemented
SF0390 # 04 Y:2010 04 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,023 $1,764 Implemented
SF0390 # 05 Y:2010 05 2010 INSULATE BARE EQUIPMENT $24,404 $7,250 Implemented
SF0390 # 06 Y:2010 06 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,991 $789 Implemented