IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,504

matching recommendations
Reset
SIC 3069 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0390 # 15 Y:2010 15 2010 USE PHOTOCELL CONTROLS $1,030 $2,587 Implemented
SF0390 # 16 Y:2010 16 2010 INSTALL OCCUPANCY SENSORS $2,946 $75 Not Implemented
SF0390 # 17 Y:2010 17 2010 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $6,167 $17,310 Not Implemented
SF0390 # 18 Y:2010 18 2010 OPTIMIZE PLANT POWER FACTOR $5,696 $21,908 Implemented
IC0171 # 04 Y:2010 04 2010 INSTALL OCCUPANCY SENSORS $517 $1,317 Not Implemented
IC0171 # 05 Y:2010 05 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,545 $345 Implemented
IC0171 # 06 Y:2010 06 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,860 $5,879 Not Implemented
IC0171 # 07 Y:2010 07 2010 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $2,143 $1,178 Not Implemented
IC0171 # 08 Y:2010 08 2010 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $438 $1 Not Implemented
IC0171 # 09 Y:2010 09 2010 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $324 $1 Implemented
IC0171 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,901 $6,914 Not Implemented
IC0171 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $91 $58 Not Implemented
IC0171 # 03 Y:2010 03 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $26,223 $99,311 Implemented
IA0447 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $745 $487 Not Implemented
IA0447 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,514 $13,439 Implemented
IA0447 # 03 Y:2010 03 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,599 $1,140 Implemented
IA0447 # 04 Y:2010 04 2010 REDUCE VENTILATION AIR $3,072 $2,000 Implemented
IA0447 # 05 Y:2010 05 2010 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $6,801 $42,100 Not Implemented
IA0447 # 06 Y:2010 06 2010 REPLACE BOILER $29,283 $53,900 Implemented
IA0447 # 07 Y:2010 07 2010 SUBSTITUTE HOT PROCESS FLUIDS FOR STEAM $525 $5,000 Implemented
DL0046 # 01 Y:2010 01 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $4,503 $0 Not Implemented
DL0046 # 02 Y:2010 02 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $2,940 $0 Not Implemented
DL0046 # 03 Y:2010 03 2010 INSULATE BARE EQUIPMENT $7,292 $520 Not Implemented
DL0046 # 04 Y:2010 04 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,168 $1,500 Implemented
DL0046 # 05 Y:2010 05 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,619 $10,000 Implemented