Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,537
matching recommendationsSIC | 3069 | Fabricated Rubber Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0600 # 07 Y:2007 | 07 | 2007 | USE SOLAR HEAT TO MAKE ELECTRICTY | $1,560 | $11,000 | Implemented |
CO0600 # 08 Y:2007 | 08 | 2007 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,050 | $6,160 | Not Implemented |
CO0600 # 09 Y:2007 | 09 | 2007 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $790 | $0 | Implemented |
TA0118 # 01 Y:2006 | 01 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,339 | $2,016 | Implemented |
TA0118 # 02 Y:2006 | 02 | 2006 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,842 | $2,000 | Implemented |
TA0118 # 03 Y:2006 | 03 | 2006 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $141 | $141 | Not Implemented |
TA0118 # 04 Y:2006 | 04 | 2006 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,049 | $90 | Implemented |
TA0118 # 05 Y:2006 | 05 | 2006 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $520 | $0 | Implemented |
TA0118 # 06 Y:2006 | 06 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $350 | $0 | Implemented |
MA0594 # 01 Y:2006 | 01 | 2006 | INSTALL TIMERS AND/OR THERMOSTATS | $123,147 | $15,525 | Implemented |
MA0594 # 02 Y:2006 | 02 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $49,354 | $121,835 | Implemented |
MA0594 # 03 Y:2006 | 03 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $40,484 | $141,413 | Not Implemented |
MA0594 # 04 Y:2006 | 04 | 2006 | REPAIR OR REPLACE STEAM TRAPS | $11,241 | $7,665 | Not Implemented |
MA0594 # 05 Y:2006 | 05 | 2006 | REDUCE VENTILATION AIR | $5,860 | $3,505 | Implemented |
MA0594 # 06 Y:2006 | 06 | 2006 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $4,046 | $0 | Implemented |
MA0594 # 07 Y:2006 | 07 | 2006 | INSULATE BARE EQUIPMENT | $3,159 | $5,681 | Not Implemented |
MA0594 # 08 Y:2006 | 08 | 2006 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $2,600 | $500 | Not Implemented |
MA0582 # 01 Y:2005 | 01 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $98,511 | $312,103 | Not Implemented |
MA0582 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $37,163 | $86,315 | Implemented |
MA0582 # 03 Y:2005 | 03 | 2005 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $15,630 | $6,540 | Implemented |
MA0582 # 04 Y:2005 | 04 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $14,153 | $0 | Implemented |
MA0582 # 05 Y:2005 | 05 | 2005 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $13,602 | $77,760 | Not Implemented |
MA0582 # 06 Y:2005 | 06 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,599 | $2,010 | Implemented |
MA0582 # 07 Y:2005 | 07 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,815 | $7,660 | Implemented |
MA0582 # 08 Y:2005 | 08 | 2005 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $6,340 | $25,150 | Implemented |