IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,537

matching recommendations
Reset
SIC 3069 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0285 # 02 Y:2004 02 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,455 $0 Not Implemented
WV0285 # 03 Y:2004 03 2004 DEVELOP A REPAIR/REPLACE POLICY $1,782 $450 Implemented
WV0285 # 04 Y:2004 04 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,648 $30 Implemented
WV0285 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,310 $0 Implemented
WV0285 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,069 $250 Implemented
WV0285 # 07 Y:2004 07 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $448 $240 Not Implemented
WV0285 # 08 Y:2004 08 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $418 $200 Not Implemented
WV0285 # 09 Y:2004 09 2004 USE SYNTHETIC LUBRICANT $356 $215 Implemented
SD0333 # 01 Y:2004 01 2004 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $14,979 $15,000 Not Implemented
SD0333 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $14,470 $600 Implemented
SD0333 # 03 Y:2004 03 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $7,390 $0 Not Implemented
SD0333 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,253 $192 Implemented
SD0333 # 05 Y:2004 05 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,128 $0 Implemented
SD0333 # 06 Y:2004 06 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,645 $3,125 Not Implemented
SD0333 # 07 Y:2004 07 2004 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $6,600 $15,000 Not Implemented
SD0333 # 08 Y:2004 08 2004 INCREASE USE OF AUTOMATION $57,000 $110,000 Implemented
LE0178 # 01 Y:2004 01 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $15,185 $6,000 Not Implemented
LE0178 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,795 $75,903 Not Implemented
LE0178 # 03 Y:2004 03 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,543 $750 Not Implemented
LE0178 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,515 $300 Not Implemented
LE0178 # 05 Y:2004 05 2004 INSULATE BARE EQUIPMENT $5,757 $720 Not Implemented
LE0178 # 06 Y:2004 06 2004 CONTRACT A WOOD PALLET RECYCLING COMPANY $4,940 $0 Not Implemented
LE0178 # 07 Y:2004 07 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,837 $2,500 Not Implemented
LE0178 # 08 Y:2004 08 2004 OPTIMIZE PLANT POWER FACTOR $1,521 $6,250 Not Implemented
LE0178 # 09 Y:2004 09 2004 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,371 $0 Not Implemented