Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
135
matching recommendationsSIC | 3069 | Fabricated Rubber Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0390 # 04 Y:2010 | 04 | 2010 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,023 | $1,764 | Implemented |
SF0390 # 05 Y:2010 | 05 | 2010 | INSULATE BARE EQUIPMENT | $24,404 | $7,250 | Implemented |
SF0390 # 06 Y:2010 | 06 | 2010 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,991 | $789 | Implemented |
SF0390 # 07 Y:2010 | 07 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,024 | $5,560 | Implemented |
SF0390 # 08 Y:2010 | 08 | 2010 | INSULATE BARE EQUIPMENT | $4,611 | $2,176 | Not Implemented |
SF0390 # 09 Y:2010 | 09 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $326 | $261 | Not Implemented |
SF0390 # 10 Y:2010 | 10 | 2010 | INSULATE BARE EQUIPMENT | $996 | $821 | Not Implemented |
SF0390 # 11 Y:2010 | 11 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,039 | $2,749 | Implemented |
SF0390 # 12 Y:2010 | 12 | 2010 | USE COMPRESSOR AIR FILTERS | $2,168 | $3,000 | Implemented |
SF0390 # 13 Y:2010 | 13 | 2010 | USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS | $39,251 | $58,106 | Implemented |
SF0390 # 14 Y:2010 | 14 | 2010 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $846 | $1,500 | Not Implemented |
SF0390 # 15 Y:2010 | 15 | 2010 | USE PHOTOCELL CONTROLS | $1,030 | $2,587 | Implemented |
SF0390 # 16 Y:2010 | 16 | 2010 | INSTALL OCCUPANCY SENSORS | $2,946 | $75 | Not Implemented |
SF0390 # 17 Y:2010 | 17 | 2010 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $6,167 | $17,310 | Not Implemented |
SF0390 # 18 Y:2010 | 18 | 2010 | OPTIMIZE PLANT POWER FACTOR | $5,696 | $21,908 | Implemented |
SF0351 # 01 Y:2008 | 01 | 2008 | REPAIR AND ELIMINATE STEAM LEAKS | $3,571 | $0 | Implemented |
SF0351 # 02 Y:2008 | 02 | 2008 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,336 | $0 | Implemented |
SF0351 # 03 Y:2008 | 03 | 2008 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,240 | $150 | Not Implemented |
SF0351 # 04 Y:2008 | 04 | 2008 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,173 | $0 | Not Implemented |
SF0351 # 05 Y:2008 | 05 | 2008 | INSULATE BARE EQUIPMENT | $584 | $0 | Not Implemented |
SF0351 # 06 Y:2008 | 06 | 2008 | INSTALL OCCUPANCY SENSORS | $2,396 | $290 | Not Implemented |
SF0351 # 07 Y:2008 | 07 | 2008 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,173 | $228 | Not Implemented |
SF0351 # 08 Y:2008 | 08 | 2008 | INSULATE BARE EQUIPMENT | $685 | $503 | Not Implemented |
SF0351 # 09 Y:2008 | 09 | 2008 | REDUCE EXCESSIVE BOILER BLOWDOWN | $1,877 | $2,802 | Not Implemented |
SF0351 # 10 Y:2008 | 10 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,144 | $1,792 | Not Implemented |