Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,537
matching recommendationsSIC | 3069 | Fabricated Rubber Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0246 # 09 Y:2000 | 09 | 2000 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $24,480 | $15,000 | Not Implemented |
ND0348 # 01 Y:2000 | 01 | 2000 | REPLACE BOILER | $4,017 | $10,000 | Implemented |
ND0348 # 02 Y:2000 | 02 | 2000 | INSULATE BARE EQUIPMENT | $271 | $925 | Implemented |
ND0348 # 03 Y:2000 | 03 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,914 | $3,344 | Not Implemented |
ND0348 # 04 Y:2000 | 04 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $268 | $200 | Implemented |
ND0348 # 05 Y:2000 | 05 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $524 | $385 | Implemented |
ND0348 # 06 Y:2000 | 06 | 2000 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $433 | $400 | Implemented |
ND0348 # 07 Y:2000 | 07 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $250,000 | $40,000 | Not Implemented |
ND0348 # 08 Y:2000 | 08 | 2000 | METER WASTE WATER | $10,112 | $250 | Not Implemented |
ND0348 # 09 Y:2000 | 09 | 2000 | REUSE / RECYCLE/ SELL RUBBER PRODUCTS | $10,000 | $200 | Not Implemented |
BD0142 # 01 Y:1999 | 01 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,333 | $2,050 | Implemented |
BD0142 # 02 Y:1999 | 02 | 1999 | INSTALL OCCUPANCY SENSORS | $325 | $675 | Implemented |
BD0142 # 03 Y:1999 | 03 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $141 | $0 | Implemented |
BD0142 # 04 Y:1999 | 04 | 1999 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $25,426 | $5,000 | Implemented |
BD0142 # 05 Y:1999 | 05 | 1999 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $1,238 | $3,500 | Not Implemented |
BD0142 # 06 Y:1999 | 06 | 1999 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $2,080 | $6,500 | Implemented |
MA0450 # 01 Y:1999 | 01 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $75,618 | $250,000 | Not Implemented |
MA0450 # 02 Y:1999 | 02 | 1999 | INSTALL OCCUPANCY SENSORS | $1,042 | $1,000 | Implemented |
MA0450 # 03 Y:1999 | 03 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,892 | $5,813 | Implemented |
MA0450 # 04 Y:1999 | 04 | 1999 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $456 | $1,275 | Not Implemented |
MA0450 # 05 Y:1999 | 05 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,423 | $5,216 | Implemented |
MA0450 # 06 Y:1999 | 06 | 1999 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $537 | $0 | Implemented |
MA0447 # 01 Y:1999 | 01 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,407 | $19,500 | Not Implemented |
MA0447 # 02 Y:1999 | 02 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,131 | $4,925 | Implemented |
MA0447 # 03 Y:1999 | 03 | 1999 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $1,511 | $2,500 | Not Implemented |