IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,504

matching recommendations
Reset
SIC 3069 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ND0334 # 11 Y:1999 11 1999 SELL OIL TO RECYCLER $900 $2,000 Not Implemented
ND0334 # 12 Y:1999 12 1999 $528 $0 Not Implemented
GT0664 # 01 Y:1999 01 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $31,943 $0 Not Implemented
GT0664 # 02 Y:1999 02 1999 INSULATE BARE EQUIPMENT $13,210 $19,500 Implemented
GT0664 # 03 Y:1999 03 1999 METER WASTE WATER $408 $450 Not Implemented
GT0664 # 04 Y:1999 04 1999 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $2,465 $1,280 Not Implemented
GT0664 # 05 Y:1999 05 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,487 $890 Not Implemented
GT0664 # 06 Y:1999 06 1999 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,985 $660 Implemented
GT0664 # 07 Y:1999 07 1999 INSTALL FOSSIL FUEL MAKE-UP AIR UNIT $2,110 $5,500 Not Implemented
GT0664 # 08 Y:1999 08 1999 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $29,350 $5,500 Not Implemented
GT0664 # 09 Y:1999 09 1999 MINIMIZE WATER USAGE $3,000 $10,100 Not Implemented
GT0649 # 01 Y:1998 01 1998 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $66,324 $81,400 Not Implemented
GT0649 # 02 Y:1998 02 1998 COMBINE UTILITY METERS $2,240 $0 Not Implemented
GT0649 # 03 Y:1998 03 1998 INSULATE BARE EQUIPMENT $1,648 $1,050 Not Implemented
GT0649 # 04 Y:1998 04 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,426 $150 Not Implemented
GT0649 # 05 Y:1998 05 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,544 $17,439 Not Implemented
GT0649 # 06 Y:1998 06 1998 $289,504 $27,000 Not Implemented
GT0649 # 07 Y:1998 07 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,456 $6,189 Not Implemented
GT0649 # 08 Y:1998 08 1998 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $3,046 $0 Not Implemented
GT0649 # 09 Y:1998 09 1998 ELIMINATE PRACTICE OF MIXING WASTE STREAMS $4,100 $1,000 Not Implemented
MA0429 # 01 Y:1998 01 1998 $14,812 $19,107 Not Implemented
MA0429 # 02 Y:1998 02 1998 TURN OFF EQUIPMENT WHEN NOT IN USE $1,695 $5,302 Implemented
MA0429 # 03 Y:1998 03 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $268 $0 Implemented
MA0429 # 04 Y:1998 04 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $412 $60 Implemented
MA0429 # 05 Y:1998 05 1998 INSTALL / REPAIR INSULATION ON STEAM LINES $269 $66 Not Implemented