IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,537

matching recommendations
Reset
SIC 3069 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AR0124 # 05 Y:1997 05 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,903 $0 Implemented
AR0124 # 06 Y:1997 06 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $376 $100 Implemented
AR0124 # 07 Y:1997 07 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,103 $1,238 Implemented
AR0124 # 08 Y:1997 08 1997 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $950 $100 Implemented
AR0124 # 09 Y:1997 09 1997 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $3,514 $0 Not Implemented
AR0124 # 10 Y:1997 10 1997 INSTALL AUTOMATIC PACKING EQUIPMENT $26,000 $2,500 Not Implemented
MS0096 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,195 $7,228 Implemented
MS0096 # 02 Y:1997 02 1997 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $13,603 $17,448 Implemented
MS0096 # 03 Y:1997 03 1997 DISTILL CONTAMINATED SOLVENTS FOR REUSE $19,264 $5,738 Implemented
MS0096 # 04 Y:1997 04 1997 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $346,828 $10,000 Not Implemented
UD0523 # 01 Y:1997 01 1997 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $34,683 $0 Implemented
UD0523 # 02 Y:1997 02 1997 REVISE RAW MATERIAL SPECS $203,890 $100,000 Implemented
UD0523 # 03 Y:1997 03 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,766 $4,000 Not Implemented
UD0523 # 04 Y:1997 04 1997 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,323 $0 Not Implemented
UD0523 # 05 Y:1997 05 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,484 $16,515 Not Implemented
WV0119 # 01 Y:1997 01 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,645 $5,151 Not Implemented
WV0119 # 02 Y:1997 02 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,860 $345 Implemented
WV0119 # 03 Y:1997 03 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,490 $350 Implemented
WV0119 # 04 Y:1997 04 1997 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $3,575 $5,757 Not Implemented
WV0119 # 05 Y:1997 05 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $617 $500 Implemented
WV0119 # 06 Y:1997 06 1997 REPAIR AND ELIMINATE STEAM LEAKS $3,700 $1,200 Implemented
WV0119 # 07 Y:1997 07 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $2,660 $2,700 Not Implemented
WV0119 # 08 Y:1997 08 1997 INSULATE BARE EQUIPMENT $7,824 $5,127 Not Implemented
WV0119 # 09 Y:1997 09 1997 DIRECT WARMEST AIR TO COMBUSTION INTAKE $7,136 $16,305 Implemented
WV0119 # 10 Y:1997 10 1997 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $137,441 $16,000 Implemented