Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,530
matching recommendationsSIC | 3069 | Fabricated Rubber Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UL2211 # 01 Y:2022 | 01 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,600 | $15,000 | Not Implemented |
UL2211 # 02 Y:2022 | 02 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,806 | $20,000 | Not Implemented |
UL2211 # 03 Y:2022 | 03 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,815 | $0 | Implemented |
UL2211 # 04 Y:2022 | 04 | 2022 | OPTIMIZE PLANT POWER FACTOR | $61,887 | $45,461 | Implemented |
UL2211 # 05 Y:2022 | 05 | 2022 | USE SOLAR HEAT TO MAKE ELECTRICTY | $96,458 | $783,531 | Not Implemented |
UL2211 # 06 Y:2022 | 06 | 2022 | USE SOLAR HEAT TO HEAT WATER | $60,938 | $150,000 | Not Implemented |
UL2211 # 07 Y:2022 | 07 | 2022 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,765 | $0 | Implemented |
OK1061 # 04 Y:2022 | 04 | 2022 | OPTIMIZE PLANT POWER FACTOR | $916 | $3,000 | Not Implemented |
OK1061 # 03 Y:2022 | 03 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $5,272 | $10,969 | Not Implemented |
OK1061 # 02 Y:2022 | 02 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $995 | $0 | Not Implemented |
OK1061 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,581 | $11,349 | Not Implemented |
TR0027 # 01 Y:2020 | 01 | 2020 | USE OPTIMUM THICKNESS INSULATION | $5,150 | $2,324 | Implemented |
TR0027 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,123 | $1,562 | Implemented |
TR0027 # 03 Y:2020 | 03 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,856 | $4,480 | Implemented |
TR0027 # 04 Y:2020 | 04 | 2020 | INSTALL OCCUPANCY SENSORS | $44 | $60 | Implemented |
AM0803 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,995 | $34,780 | Implemented |
AM0803 # 02 Y:2020 | 02 | 2020 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $28,400 | $2,000 | Implemented |
AM0803 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,980 | $1,700 | Implemented |
AM0803 # 04 Y:2020 | 04 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,880 | $3,630 | Implemented |
AM0803 # 05 Y:2020 | 05 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,450 | $20 | Implemented |
AM0803 # 06 Y:2020 | 06 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,070 | $545 | Implemented |
AM0803 # 07 Y:2020 | 07 | 2020 | INSTALL OCCUPANCY SENSORS | $1,010 | $200 | Not Implemented |
AM0803 # 08 Y:2020 | 08 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $760 | $500 | Implemented |
AM0803 # 09 Y:2020 | 09 | 2020 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $395 | $115 | Implemented |
AM0803 # 10 Y:2020 | 10 | 2020 | INSULATE BARE EQUIPMENT | $340 | $144 | Implemented |