Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

207

matching recommendations
Reset
SIC 3069 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0791 # 13 Y:2009 13 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,250 $7,735 Not Implemented
UD0791 # 14 Y:2009 14 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,996 $6,668 Not Implemented
UD0791 # 15 Y:2009 15 2009 CLOSE OFF UNNEEDED STEAM LINES $1,974 $1,100 Implemented
UD0791 # 16 Y:2009 16 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $924 $0 Not Implemented
UD0791 # 17 Y:2009 17 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $552 $1,000 Implemented
WV0299 # 01 Y:2004 01 2004 INSULATE BARE EQUIPMENT $10,724 $2,060 Implemented
WV0299 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,651 $16,100 Implemented
WV0299 # 03 Y:2004 03 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,725 $1,000 Implemented
WV0299 # 04 Y:2004 04 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,783 $1,937 Implemented
WV0299 # 05 Y:2004 05 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,704 $2,175 Not Implemented
WV0299 # 06 Y:2004 06 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,363 $300 Implemented
WV0299 # 07 Y:2004 07 2004 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $2,364 $40 Not Implemented
WV0299 # 08 Y:2004 08 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,152 $160 Implemented
WV0299 # 09 Y:2004 09 2004 DEVELOP A REPAIR/REPLACE POLICY $3,018 $430 Implemented
WV0299 # 10 Y:2004 10 2004 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $1,406 $1,320 Not Implemented
WV0299 # 11 Y:2004 11 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,387 $640 Implemented
WV0299 # 12 Y:2004 12 2004 USE SYNTHETIC LUBRICANT $951 $240 Implemented
WV0299 # 13 Y:2004 13 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $784 $0 Implemented
WV0299 # 14 Y:2004 14 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $726 $150 Implemented
WV0299 # 15 Y:2004 15 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $691 $230 Implemented
WV0299 # 16 Y:2004 16 2004 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $672 $600 Implemented
WV0285 # 01 Y:2004 01 2004 INSULATE BARE EQUIPMENT $12,938 $1 Implemented
WV0285 # 02 Y:2004 02 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,455 $0 Not Implemented
WV0285 # 03 Y:2004 03 2004 DEVELOP A REPAIR/REPLACE POLICY $1,782 $450 Implemented
WV0285 # 04 Y:2004 04 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,648 $30 Implemented