Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,530
matching recommendationsSIC | 3069 | Fabricated Rubber Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0803 # 11 Y:2020 | 11 | 2020 | INSULATE BARE EQUIPMENT | $130 | $190 | Implemented |
AM0792 # 01 Y:2019 | 01 | 2019 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $2,250 | $2,000 | Implemented |
AM0792 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,230 | $500 | Implemented |
AM0792 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,122 | $3,340 | Implemented |
AM0792 # 04 Y:2019 | 04 | 2019 | USE PHOTOCELL CONTROLS | $426 | $150 | Implemented |
AM0792 # 05 Y:2019 | 05 | 2019 | USE SYNTHETIC LUBRICANT | $340 | $100 | Implemented |
NC0641 # 01 Y:2019 | 01 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,164 | $120 | Not Implemented |
NC0641 # 02 Y:2019 | 02 | 2019 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $18,554 | $21,000 | Not Implemented |
NC0641 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $29,143 | $35,000 | Implemented |
NC0641 # 04 Y:2019 | 04 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,183 | $16,246 | Not Implemented |
WV0585 # 01 Y:2019 | 01 | 2019 | RECYCLE WHITE WATER | $175,950 | $82,900 | Not Implemented |
WV0585 # 02 Y:2019 | 02 | 2019 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $33,124 | $77,800 | Not Implemented |
WV0585 # 03 Y:2019 | 03 | 2019 | INSULATE BARE EQUIPMENT | $30,373 | $10,462 | Not Implemented |
WV0585 # 04 Y:2019 | 04 | 2019 | UPGRADE CONTROLS ON COMPRESSORS | $18,306 | $16,750 | Not Implemented |
WV0585 # 05 Y:2019 | 05 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $9,261 | $0 | Implemented |
WV0585 # 06 Y:2019 | 06 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,658 | $9,998 | Implemented |
WV0585 # 07 Y:2019 | 07 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,160 | $1,100 | Implemented |
WV0585 # 08 Y:2019 | 08 | 2019 | DEVELOP A REPAIR/REPLACE POLICY | $5,125 | $1,450 | Implemented |
WV0585 # 09 Y:2019 | 09 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,529 | $250 | Not Implemented |
WV0585 # 10 Y:2019 | 10 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,014 | $1,303 | Implemented |
TR0014 # 01 Y:2019 | 01 | 2019 | PAY UTILITY BILLS ON TIME | $2,781 | $0 | Implemented |
TR0014 # 02 Y:2019 | 02 | 2019 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $3,582 | $0 | Implemented |
TR0014 # 03 Y:2019 | 03 | 2019 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $9,971 | $8,500 | Implemented |
TR0014 # 04 Y:2019 | 04 | 2019 | METER WASTE WATER | $719 | $1,511 | Implemented |
TR0014 # 05 Y:2019 | 05 | 2019 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,996 | $8,838 | Implemented |