IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

55

matching recommendations
Reset
SIC 3069 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0768 # 09 Y:2016 09 2016 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $122 $300 Not Implemented
MA0768 # 01 Y:2016 01 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,870 $3,830 Not Implemented
MA0768 # 02 Y:2016 02 2016 INSTALL / REPAIR INSULATION ON STEAM LINES $939 $3,914 Implemented
MA0768 # 03 Y:2016 03 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $871 $1,000 Implemented
MA0768 # 04 Y:2016 04 2016 MINIMIZE WATER USAGE $587 $3,650 Implemented
MA0768 # 05 Y:2016 05 2016 OPTIMIZE PLANT POWER FACTOR $515 $3,480 Not Implemented
MA0768 # 06 Y:2016 06 2016 CLOSE OFF UNNEEDED STEAM LINES $376 $4,348 Implemented
MA0768 # 07 Y:2016 07 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $331 $2,648 Not Implemented
MA0768 # 08 Y:2016 08 2016 INSTALL / REPAIR INSULATION ON STEAM LINES $313 $1,944 Implemented
MA0450 # 01 Y:1999 01 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $75,618 $250,000 Not Implemented
MA0450 # 03 Y:1999 03 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,892 $5,813 Implemented
MA0450 # 02 Y:1999 02 1999 INSTALL OCCUPANCY SENSORS $1,042 $1,000 Implemented
MA0450 # 05 Y:1999 05 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,423 $5,216 Implemented
MA0450 # 06 Y:1999 06 1999 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $537 $0 Implemented
MA0450 # 04 Y:1999 04 1999 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $456 $1,275 Not Implemented
MA0447 # 04 Y:1999 04 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,321 $45,420 Not Implemented
MA0447 # 07 Y:1999 07 1999 INSTALL TIMERS AND/OR THERMOSTATS $473 $748 Implemented
MA0447 # 08 Y:1999 08 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $940 $5,925 Not Implemented
MA0447 # 05 Y:1999 05 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $591 $120 Implemented
MA0447 # 06 Y:1999 06 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $504 $455 Not Implemented
MA0447 # 03 Y:1999 03 1999 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $1,511 $2,500 Not Implemented
MA0447 # 02 Y:1999 02 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,131 $4,925 Implemented
MA0447 # 01 Y:1999 01 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,407 $19,500 Not Implemented
MA0328 # 10 Y:1995 10 1995 DISTILL CONTAMINATED SOLVENTS FOR REUSE $12,875 $19,300 Not Implemented
MA0328 # 11 Y:1995 11 1995 RECOVER AND REUSE COOLING WATER $11,258 $14,000 Not Implemented