IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

37

matching recommendations
Reset
SIC 3069 Fabricated Rubber Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0451 # 06 Y:2012 06 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $158 $100 Implemented
NC0451 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,790 $14,320 Implemented
NC0451 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $444 $1,674 Implemented
NC0451 # 05 Y:2012 05 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,516 $4,075 Implemented
NC0451 # 04 Y:2012 04 2012 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $2,656 $1,800 Not Implemented
NC0451 # 03 Y:2012 03 2012 INSTALL OCCUPANCY SENSORS $252 $533 Implemented
TN0605 # 06 Y:1997 06 1997 REUSE / RECYCLE/ SELL RUBBER PRODUCTS $5,430 $14,800 Not Implemented
TN0605 # 04 Y:1997 04 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $10,910 $1,330 Implemented
TN0605 # 03 Y:1997 03 1997 KEEP BOILER TUBES CLEAN $39,970 $70,960 Implemented
TN0605 # 01 Y:1997 01 1997 INSTALL EQUIPMENT TO MOVE PRODUCT $104,110 $129,700 Implemented
TN0605 # 05 Y:1997 05 1997 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $10,880 $25,180 Not Implemented
TN0605 # 02 Y:1997 02 1997 REDUCE SCRAP PRODUCTION $100,760 $25,700 Implemented
NC0069 # 01 Y:1995 01 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,000 $45,000 Implemented
NC0069 # 02 Y:1995 02 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $388 $300 Implemented
NC0069 # 03 Y:1995 03 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $580 $588 Not Implemented
NC0069 # 04 Y:1995 04 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $192 $168 Implemented
NC0069 # 05 Y:1995 05 1995 REDUCE VENTILATION AIR $782 $1,250 Not Implemented
NC0069 # 06 Y:1995 06 1995 INSULATE BARE EQUIPMENT $538 $864 Not Implemented
NC0069 # 07 Y:1995 07 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $20,681 $40,000 Not Implemented
NC0069 # 08 Y:1995 08 1995 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $6,888 $7,500 Implemented
NC0069 # 09 Y:1995 09 1995 REPLACE GASOLINE WITH DIESEL, LPG, OR NATURAL GAS $5,434 $7,200 Not Implemented
NC0037 # 01 Y:1994 01 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $494 $360 Not Implemented
NC0037 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,656 $28,570 Not Implemented
NC0037 # 03 Y:1994 03 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,535 $4,662 Not Implemented
NC0037 # 04 Y:1994 04 1994 DIRECT WARMEST AIR TO COMBUSTION INTAKE $420 $300 Not Implemented