Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
24
matching recommendationsSIC | 3069 | Fabricated Rubber Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TS0004 # 07 Y:1984 | 07 | 1984 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $10,352 | $25,218 | Not Implemented |
TS0004 # 06 Y:1984 | 06 | 1984 | INSTALL SET-BACK TIMERS | $5,296 | $0 | Not Implemented |
TS0004 # 05 Y:1984 | 05 | 1984 | INSULATE BARE EQUIPMENT | $11,480 | $5,460 | Not Implemented |
TS0004 # 04 Y:1984 | 04 | 1984 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $15,174 | $42,000 | Not Implemented |
TS0004 # 03 Y:1984 | 03 | 1984 | INSULATE BARE EQUIPMENT | $396 | $33 | Not Implemented |
TS0004 # 02 Y:1984 | 02 | 1984 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $11,748 | $0 | Not Implemented |
TS0004 # 01 Y:1984 | 01 | 1984 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,158 | $1,360 | Not Implemented |
MA0004 # 02 Y:1984 | 02 | 1984 | INSTALL SET-BACK TIMERS | $5,293 | $500 | Implemented |
MA0004 # 04 Y:1984 | 04 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,455 | $200 | Implemented |
MA0004 # 03 Y:1984 | 03 | 1984 | REDUCE VENTILATION AIR | $33,473 | $1,896 | Implemented |
MA0004 # 01 Y:1984 | 01 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,079 | $228 | Implemented |
TN0217 # 05 Y:1984 | 05 | 1984 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $10,488 | $0 | Not Implemented |
TN0217 # 06 Y:1984 | 06 | 1984 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,447 | $0 | Implemented |
TN0217 # 07 Y:1984 | 07 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,610 | $50 | Implemented |
TN0217 # 04 Y:1984 | 04 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $12,424 | $1,200 | Implemented |
TN0217 # 03 Y:1984 | 03 | 1984 | REPAIR AND ELIMINATE STEAM LEAKS | $22,604 | $1,425 | Implemented |
TN0217 # 02 Y:1984 | 02 | 1984 | INSTALL / REPAIR INSULATION ON STEAM LINES | $24,926 | $1,300 | Implemented |
TN0217 # 01 Y:1984 | 01 | 1984 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $51,259 | $42,740 | Not Implemented |
UD0114 # 01 Y:1984 | 01 | 1984 | UPGRADE OBSOLETE EQUIPMENT | $20,480 | $5,070 | Implemented |
UD0114 # 02 Y:1984 | 02 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,818 | $900 | Implemented |
UD0114 # 03 Y:1984 | 03 | 1984 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $852 | $0 | Not Implemented |
UD0114 # 04 Y:1984 | 04 | 1984 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $2,038 | $4,000 | Implemented |
UD0114 # 05 Y:1984 | 05 | 1984 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $7,377 | $33,750 | Implemented |
UD0114 # 06 Y:1984 | 06 | 1984 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $4,899 | $0 | Implemented |