Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
49
matching recommendationsSIC | 3069 | Fabricated Rubber Products, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TR0058 # 04 Y:2023 | 04 | 2023 | METER WASTE WATER | $408 | $1,511 | n/a |
TR0058 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $727 | $2,781 | n/a |
TR0058 # 02 Y:2023 | 02 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,706 | $7,350 | n/a |
TR0058 # 01 Y:2023 | 01 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $31,832 | $216,216 | n/a |
WV0653 # 12 Y:2023 | 12 | 2023 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $4,538 | $21,440 | Not Implemented |
WV0653 # 02 Y:2023 | 02 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $46,512 | $82,920 | Not Implemented |
WV0653 # 14 Y:2023 | 14 | 2023 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $3,320 | $1,500 | Implemented |
WV0653 # 13 Y:2023 | 13 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,757 | $1,288 | Implemented |
WV0653 # 10 Y:2023 | 10 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $5,884 | $14,800 | Implemented |
WV0653 # 11 Y:2023 | 11 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,758 | $2,675 | Implemented |
WV0653 # 08 Y:2023 | 08 | 2023 | DEVELOP A REPAIR/REPLACE POLICY | $10,683 | $9,567 | Implemented |
WV0653 # 09 Y:2023 | 09 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,240 | $12,390 | Not Implemented |
WV0653 # 06 Y:2023 | 06 | 2023 | MINIMIZE WATER USAGE | $13,630 | $45,516 | Implemented |
WV0653 # 07 Y:2023 | 07 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,961 | $800 | Implemented |
WV0653 # 17 Y:2023 | 17 | 2023 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $1,453 | $7,240 | Not Implemented |
WV0653 # 16 Y:2023 | 16 | 2023 | INSULATE BARE EQUIPMENT | $1,621 | $787 | Implemented |
WV0653 # 15 Y:2023 | 15 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,200 | $3,036 | Implemented |
WV0653 # 03 Y:2023 | 03 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $38,158 | $64,250 | Implemented |
WV0653 # 04 Y:2023 | 04 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $33,555 | $52,800 | Implemented |
WV0653 # 05 Y:2023 | 05 | 2023 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $27,203 | $93,600 | Not Implemented |
WV0653 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $75,356 | $210,000 | Not Implemented |
SJ0006 # 08 Y:2023 | 08 | 2023 | INSTALL / REPAIR INSULATION ON STEAM LINES | $332 | $1,762 | Not Implemented |
SJ0006 # 07 Y:2023 | 07 | 2023 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $8,791 | $39,456 | Not Implemented |
SJ0006 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,713 | $4,600 | Not Implemented |
SJ0006 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,014 | $7,324 | Not Implemented |