IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,091

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0328 # 08 Y:1998 08 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $380 $840 Implemented
OK0551 # 01 Y:1998 01 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $898 $80,000 Implemented
OK0551 # 04 Y:1998 04 1998 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,304 $0 Implemented
OK0551 # 05 Y:1998 05 1998 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $2,522 $0 Implemented
SD0206 # 02 Y:1998 02 1998 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $5,837 $0 Implemented
SD0206 # 03 Y:1998 03 1998 USE OPTIMUM THICKNESS INSULATION $2,817 $1,076 Implemented
SD0206 # 04 Y:1998 04 1998 INSTALL SPECTRAL REFLECTORS / DELAMP $519 $1,260 Implemented
SD0206 # 05 Y:1998 05 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,374 $0 Implemented
SD0206 # 06 Y:1998 06 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,218 $8,500 Implemented
SD0206 # 07 Y:1998 07 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $6,426 $1,275 Implemented
SD0206 # 08 Y:1998 08 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $157,414 $12,000 Implemented
SD0203 # 08 Y:1998 08 1998 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $600 $0 Implemented
SD0203 # 09 Y:1998 09 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $4,400 $8,500 Implemented
NV0105 # 02 Y:1998 02 1998 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $9,271 $21,600 Implemented
NV0105 # 03 Y:1998 03 1998 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $2,061 $0 Implemented
NV0105 # 04 Y:1998 04 1998 SIZE AIR HANDLING GRILLS/ DUCT/S COILS TO MINIMIZE AIR RESISTANCE $1,030 $1,267 Implemented
NV0105 # 05 Y:1998 05 1998 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $9,488 $1,080 Implemented
NV0105 # 09 Y:1998 09 1998 USE RADIANT HEATER FOR SPOT HEATING $2,679 $8,064 Implemented
NV0105 # 10 Y:1998 10 1998 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $52,000 $14,200 Implemented
NV0105 # 12 Y:1998 12 1998 REDUCE SCRAP PRODUCTION $64,064 $375,750 Implemented
MS0113 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,208 $9,250 Implemented
MS0113 # 03 Y:1998 03 1998 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $10,852 $7,236 Implemented
MS0113 # 04 Y:1998 04 1998 OPTIMIZE PLANT POWER FACTOR $11,323 $4,875 Implemented
MS0113 # 06 Y:1998 06 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,049 $1,235 Implemented