IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,091

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0232 # 09 Y:2024 09 2024 RECOVER WASTE HEAT FROM EQUIPMENT $9,568 $10,000 Implemented
DL0232 # 17 Y:2024 17 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,477 $2,488 Implemented
DL0232 # 02 Y:2024 02 2024 INSTALL TIMERS AND/OR THERMOSTATS $4,060 $166 Implemented
DL0232 # 05 Y:2024 05 2024 INSTALL TIMERS AND/OR THERMOSTATS $10,552 $112 Implemented
DL0232 # 01 Y:2024 01 2024 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $1,952 $0 Implemented
DL0232 # 12 Y:2024 12 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,886 $5,000 Implemented
DL0232 # 06 Y:2024 06 2024 INSTALL TIMERS AND/OR THERMOSTATS $7,288 $84 Implemented
DL0232 # 14 Y:2024 14 2024 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $9,758 $1,500 Implemented
DL0232 # 13 Y:2024 13 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,930 $7,995 Implemented
DL0232 # 16 Y:2024 16 2024 UPGRADE CONTROLS ON COMPRESSORS $14,220 $30,000 Implemented
DL0232 # 03 Y:2024 03 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $848 $0 Implemented
UF0602 # 10 Y:2023 10 2023 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $215,016 $0 Implemented
UF0602 # 02 Y:2023 02 2023 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $389,519 $50,482 Implemented
UF0602 # 09 Y:2023 09 2023 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $341,860 $20,000 Implemented
UF0602 # 07 Y:2023 07 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $26,608 $0 Implemented
UF0602 # 04 Y:2023 04 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $268,820 $137,250 Implemented
UF0602 # 03 Y:2023 03 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $339,285 $786,250 Implemented
UF0602 # 08 Y:2023 08 2023 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $13,084 $4,788 Implemented
TT0304 # 07 Y:2023 07 2023 UPGRADE CONTROLS ON COMPRESSORS $5,133 $300 Implemented
TT0304 # 09 Y:2023 09 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $544 $405 Implemented
TT0304 # 02 Y:2023 02 2023 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $51,075 $120 Implemented
TT0304 # 06 Y:2023 06 2023 INSULATE BARE EQUIPMENT $6,857 $372 Implemented
TT0304 # 10 Y:2023 10 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $87 $50 Implemented
TT0304 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,867 $5 Implemented
WV0652 # 10 Y:2023 10 2023 INSULATE BARE EQUIPMENT $506 $166 Implemented