IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,163

matching recommendations
Reset
SIC 308 Miscellaneous Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0614 # 03 Y:2024 03 2024 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $24,631 $18,563 Implemented
UF0614 # 12 Y:2024 12 2024 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $10,444 $4,280 Implemented
UF0614 # 13 Y:2024 13 2024 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $27,969 $60,000 Implemented
UF0614 # 10 Y:2024 10 2024 ADJUST VENTS TO MINIMIZE ENERGY USE $2,337 $1,797 Implemented
UW2410 # 06 Y:2024 06 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $64,748 $539,875 Implemented
UW2410 # 01 Y:2024 01 2024 INSTALL EQUIPMENT TO MOVE PRODUCT $855,879 $575,120 Implemented
UW2410 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,253 $17,069 Implemented
UW2410 # 07 Y:2024 07 2024 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,810 $16,232 Implemented
UW2410 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,418 $25,000 Implemented
UW2410 # 03 Y:2024 03 2024 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE $131,806 $610,500 Implemented
UW2410 # 04 Y:2024 04 2024 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $10,200 $60,000 Implemented
UF0615 # 06 Y:2024 06 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,078 $355 Implemented
UF0615 # 05 Y:2024 05 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,911 $816 Implemented
UF0615 # 03 Y:2024 03 2024 USE DEMAND CONTROLLER OR LOAD SHEDDER $41,878 $24,095 Implemented
UF0615 # 09 Y:2024 09 2024 UPGRADE CONTROLS ON COMPRESSORS $2,456 $4,000 Implemented
UF0615 # 10 Y:2024 10 2024 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $4,769 $2,352 Implemented
UF0615 # 02 Y:2024 02 2024 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $66,500 $73,000 Implemented
UF0615 # 04 Y:2024 04 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $14,133 $22,755 Implemented
UF0615 # 11 Y:2024 11 2024 IMPROVE SPACE COMFORT CONDITIONING $20,106 $3,020 Implemented
UF0615 # 07 Y:2024 07 2024 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $8,021 $5,898 Implemented
TT0312 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,292 $635 Implemented
TT0312 # 09 Y:2024 09 2024 INSTALL OCCUPANCY SENSORS $1,294 $1,860 Implemented
TT0312 # 01 Y:2024 01 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $36,945 $0 Implemented
TT0312 # 03 Y:2024 03 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $30,815 $6,360 Implemented
NT0021 # 05 Y:2024 05 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,130 $0 Implemented